Project has been completed and closed
FIRST BAPTIST CHURCH OF TAYLOR is a New Construction project located at 2500 MALLARD LANE, Taylor, TX 76574 in Taylor, Texas. The project has an estimated value of $4.0M. MARK LAURENCE is the property owner and KAH ARCHITECTURE is the design firm of record. The project was registered with TDLR on November 4, 2016.
New Church Facility
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Nov 4, 2016
Review Complete
Inspection Complete
Closed
Oct 1, 2017
Building permits found at or near this location
Spa 8x10ft with a gas heater and autofil. 90 sq ft of concrete decking and 24 sq ft of concrete pad for equipment
ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res. [5bed 5bath] with Attached Garage.
Replacement of complete existing central heat and air system with or without duct work
*** ETJ - per contractor email is a disconnect / reconnect no meter work *** Remove and replace existing 150 amp MCB load center with new 225 amp MCB load center whole house surge protection additional grounding . (existing meter to remain as it is 200R)
Replacement of an existing water heater
Need a contractor for this project?
Browse verified general contractors active in Williamson County
Find General Contractors in Williamson