MMMC POB 2
MMMC POB 2 is a new construction project at 252 N. MATLOCK RD, Mansfield, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2017). The project has an estimated value of $11.8M.
๐Project Metrics
TDLR #EABPRJB7804806Project Closed
Project has been completed and closed
MMMC POB 2 is a New Construction project located at 252 N. MATLOCK RD, Mansfield, TX 76063 in Mansfield, Texas. The project has an estimated value of $11.8M. METHODIST HEALTH SYSTEM is the property owner and PERKINS+WILL is the design firm of record. The project was registered with TDLR on November 15, 2016.
โFrequently Asked Questions
What is MMMC POB 2?
MMMC POB 2 is a new construction project at 252 N. MATLOCK RD in Mansfield, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 4 story, 82,000 SF core and shell for a medical office building, including site improvements.
Is MMMC POB 2 open in Mansfield?
Construction on MMMC POB 2 is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2017. The building is finished and very likely open.
Where is MMMC POB 2 located?
MMMC POB 2 is located at 252 N. MATLOCK RD, Mansfield, TX, 76063, in Tarrant County.
Who is the owner or developer of MMMC POB 2?
METHODIST HEALTH SYSTEM is the property owner/developer of record for MMMC POB 2, per its TDLR project registration.
Who is the architect or design firm for MMMC POB 2?
PERKINS+WILL is the design firm of record for MMMC POB 2, according to its TDLR filing.
How much does MMMC POB 2 cost and how big is it?
MMMC POB 2 has an estimated construction value of $11.8M, based on its TDLR filing.
๐Scope of Work
4 story, 82,000 SF core and shell for a medical office building, including site improvements.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Nov 15, 2016
Review Complete
Inspection Complete
Closed
Dec 1, 2017
๐Related Projects
๐คSame Owner
$930.0M total๐Nearby Projects
Within 1 kmProperty Owner
Design Firm
Tarrant County Economy
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Tarrant County
Find General Contractors in Tarrant