2215 WESTLAKE DRIVE RENOVATION
๐Project Metrics
TDLR #EABPRJB7805481Inspection Complete
Final inspection completed, awaiting project closure
๐Scope of Work
BUILDING LOBBY ALTERATION, NEW FRONT AND BACK CANOPIES
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐Nearby Projects
Within 1 km๐Related City Permits
Building permits found at or near this location
Repair broken conduit and restrap conduit. Relocate panel and disconnects to structure. We are relocating sub-panel that powers boat dock number 7 and disconnects for solar panels that are next to the walkway and edge of water to the closest building that is about 15 feet away. Also replacing broken conduit behind sub-panel.
New underground conduit and wire to be installed for marina fuel system: - 1 STP (submersible turbine pump) 240V 15A circuit - 1 120V 20Amp circuit for HMI fuel and liquid drainage alarm. - 3 sensors ran for leak detection at sumps.
PLAN REVIEW WAS NOT NEEDED FOR THIS SCOPE OF WORK- JWE 04/04/2025 Removal and installation of an underground storage tank. Already approved through the City of Austin UST Program. This permit would be for the replacement of existing conduits to existing circuits to the fuel system. Amperages not changed.
Only replace broken permanent service pole. (Emergency)
Dock 8 - Installation of power to and installation of new light fixtures and 6 new GFCI receptacles. Check Boat Dock Ordinance
๐Related Site Plans
City of Austin site plan approvals at this location