KCC RIVER TRAIL
KCC RIVER TRAIL is a new construction project at 5235 HIGHWAY 27 E., Kerrville, in Kerr County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2017). The project has an estimated value of $150K.
๐Project Metrics
TDLR #EABPRJB7806086Project Closed
Project has been completed and closed
KCC RIVER TRAIL is a New Construction project located at 5235 HIGHWAY 27 E., Kerrville, TX 78028 in Kerrville, Texas. The project has an estimated value of $150K. JAMES AVERY CRAFTSMAN INC. is the property owner and A3 STUDIO is the design firm of record. The project was registered with TDLR on December 6, 2016.
โFrequently Asked Questions
What is KCC RIVER TRAIL?
KCC RIVER TRAIL is a new construction project at 5235 HIGHWAY 27 E. in Kerrville, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New walking trail at an existing manufacturing facility
Is KCC RIVER TRAIL open in Kerrville?
Construction on KCC RIVER TRAIL is complete โ TDLR records show the project passed its required accessibility inspection in Oct 2017. The building is finished and very likely open.
Where is KCC RIVER TRAIL located?
KCC RIVER TRAIL is located at 5235 HIGHWAY 27 E., Kerrville, TX, 78028, in Kerr County.
Who is the owner or developer of KCC RIVER TRAIL?
JAMES AVERY CRAFTSMAN INC. is the property owner/developer of record for KCC RIVER TRAIL, per its TDLR project registration.
Who is the architect or design firm for KCC RIVER TRAIL?
A3 STUDIO is the design firm of record for KCC RIVER TRAIL, according to its TDLR filing.
How much does KCC RIVER TRAIL cost and how big is it?
KCC RIVER TRAIL has an estimated construction value of $150K, based on its TDLR filing.
๐Scope of Work
New walking trail at an existing manufacturing facility
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Dec 6, 2016
Review Complete
Inspection Complete
Closed
Oct 1, 2017
๐Related Projects
Property Owner
Design Firm
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Kerr County
Find General Contractors in Kerr