HEAT BOOTCAMP is a renovation/alteration project at 110 EAST MLK DRIVE, SUITE 110, San Marcos, in Hays County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $170K.
๐Project Metrics
TDLR #EABPRJB7806215Review Complete
Design review complete, construction may proceed
HEAT BOOTCAMP is a Renovation/Alteration project located at 110 EAST MLK DRIVE, SUITE 110, San Marcos, TX 78666 in San Marcos, Texas. The project has an estimated value of $170K. MLKSM LLC is the property owner and ALLAN NUTT - ARCHITECT is the design firm of record. The project was registered with TDLR on December 7, 2016.
โFrequently Asked Questions
What is HEAT BOOTCAMP?
HEAT BOOTCAMP is a renovation/alteration project at 110 EAST MLK DRIVE, SUITE 110 in San Marcos, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior tenant finish out consisting of 3,193 sq. ft. for one fitness center.
Is HEAT BOOTCAMP open in San Marcos?
HEAT BOOTCAMP is currently under construction in San Marcos, TX. Its current TDLR status is "Review Complete".
Where is HEAT BOOTCAMP located?
HEAT BOOTCAMP is located at 110 EAST MLK DRIVE, SUITE 110, San Marcos, TX, 78666, in Hays County.
Who is the owner or developer of HEAT BOOTCAMP?
MLKSM LLC is the property owner/developer of record for HEAT BOOTCAMP, per its TDLR project registration.
Who is the architect or design firm for HEAT BOOTCAMP?
ALLAN NUTT - ARCHITECT is the design firm of record for HEAT BOOTCAMP, according to its TDLR filing.
How much does HEAT BOOTCAMP cost and how big is it?
HEAT BOOTCAMP has an estimated construction value of $170K, based on its TDLR filing.
๐Scope of Work
Interior tenant finish out consisting of 3,193 sq. ft. for one fitness center.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Dec 7, 2016
Review Complete
Dec 7, 2016
Inspection Complete
Closed
๐Related Projects
๐คSame Owner
$670K total๐๏ธSame Design Firm
$15.0M total๐Related City Permits
Building permits found at or near this location
ePlan: Commercial Expedited Review - [APPROVED New Construction of Behavior Health Hospital located at the Texas Neuro Rehab Center Campus (46219 SF).
Install Level 2 EV Charger
New construction of 2 story sfr with 3 beds 2.5 baths and attached garage
Relocate tub to where the toilet currently is and move toilet to where the tub was. Install shower valve. Run hot line from lavatory. Kill hot line to tub at manifold. Roll cold copper line into slab for commode. Run commode vent to another vent or through roof.
upgrade exterior panel