US 83 REHAB
US 83 REHAB is a new construction project at US 83 AT SOUTH CITY LIMITS, Perryton, in Ochiltree County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2017). The project has an estimated value of $111K.
๐Project Metrics
TDLR #EABPRJB7806234Project Closed
Project has been completed and closed
US 83 REHAB is a New Construction project located at US 83 AT SOUTH CITY LIMITS, Perryton, TX 79070 in Perryton, Texas. The project has an estimated value of $111K. TXDOT DISTRICT: AMARILLO is the property owner and TXDOT is the design firm of record. The project was registered with TDLR on December 7, 2016.
โFrequently Asked Questions
What is US 83 REHAB?
US 83 REHAB is a new construction project at US 83 AT SOUTH CITY LIMITS in Perryton, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of Sidewalks and ADA Ramps, Consisting of Grading, Base, Pavement and Drainage
Is US 83 REHAB open in Perryton?
Construction on US 83 REHAB is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2017. The building is finished and very likely open.
Where is US 83 REHAB located?
US 83 REHAB is located at US 83 AT SOUTH CITY LIMITS, Perryton, TX, 79070, in Ochiltree County.
Who is the owner or developer of US 83 REHAB?
TXDOT DISTRICT: AMARILLO is the property owner/developer of record for US 83 REHAB, per its TDLR project registration.
Who is the architect or design firm for US 83 REHAB?
TXDOT is the design firm of record for US 83 REHAB, according to its TDLR filing.
How much does US 83 REHAB cost and how big is it?
US 83 REHAB has an estimated construction value of $111K, based on its TDLR filing.
๐Scope of Work
Construction of Sidewalks and ADA Ramps, Consisting of Grading, Base, Pavement and Drainage
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Dec 7, 2016
Review Complete
Inspection Complete
Closed
Dec 1, 2017
๐Related Projects
๐คSame Owner
$37.03B total๐๏ธSame Design Firm
$37.03B totalProperty Owner
Design Firm
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Ochiltree County
Find General Contractors in Ochiltree