TARGET
TARGET is a renovation/alteration project at 3210 PRESTON ROAD, Frisco, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2017). The project has an estimated value of $3.5M.
๐Project Metrics
TDLR #EABPRJB7806538Project Closed
Project has been completed and closed
TARGET is a Renovation/Alteration project located at 3210 PRESTON ROAD, Frisco, TX 75034 in Frisco, Texas. The project has an estimated value of $3.5M. TARGET is the property owner and CALLISONRTKL is the design firm of record. The project was registered with TDLR on December 12, 2016.
โFrequently Asked Questions
What is TARGET?
TARGET is a renovation/alteration project at 3210 PRESTON ROAD in Frisco, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: PARTIAL DEMO OF NON-LOAD BEARING WALLS, ADDITION OF NEWNON-LOAD BEARING WALLS. FIXTURE REPLACEMENT, PARTIAL FU
Is TARGET open in Frisco?
Construction on TARGET is complete โ TDLR records show the project passed its required accessibility inspection in Aug 2017. The building is finished and very likely open.
Where is TARGET located?
TARGET is located at 3210 PRESTON ROAD, Frisco, TX, 75034, in Collin County.
Who is the owner or developer of TARGET?
TARGET is the property owner/developer of record for TARGET, per its TDLR project registration.
Who is the architect or design firm for TARGET?
CALLISONRTKL is the design firm of record for TARGET, according to its TDLR filing.
How much does TARGET cost and how big is it?
TARGET has an estimated construction value of $3.5M, based on its TDLR filing.
๐Scope of Work
PARTIAL DEMO OF NON-LOAD BEARING WALLS, ADDITION OF NEWNON-LOAD BEARING WALLS. FIXTURE REPLACEMENT, PARTIAL FU
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Dec 12, 2016
Review Complete
Inspection Complete
Closed
Aug 1, 2017