TRAMMEL FRESNO ROAD in Missouri City, TX

VICKSBURG BLVD TO FT BEND PKWY, Missouri City, TX, 77545

Construction complete · Jun 2018Project Closed

TRAMMEL FRESNO ROAD is a new construction project at VICKSBURG BLVD TO FT BEND PKWY, Missouri City, in Fort Bend County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2018). The project has an estimated value of $135K.

Estimated project value
$135K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1 year
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Dec 14, 2016534 days across supplied datesJun 1, 2018

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    169 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    365 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77545 (Missouri City)

One email per change. Unsubscribe in one click. Privacy.

TRAMMEL FRESNO ROAD is a New Construction project located at VICKSBURG BLVD TO FT BEND PKWY, Missouri City, TX 77545 in Missouri City, Texas. The project has an estimated value of $135K. TXDOT DISTRICT: HOUSTON is the property owner and CIVILCORP LLC is the design firm of record. The project was registered with TDLR on December 14, 2016.

Frequently Asked Questions

What is TRAMMEL FRESNO ROAD?

TRAMMEL FRESNO ROAD is a new construction project at VICKSBURG BLVD TO FT BEND PKWY in Missouri City, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Reconstruction of 2 lane existing roadway to 4 lane roadway with sidewalk

Is TRAMMEL FRESNO ROAD open in Missouri City?

Construction on TRAMMEL FRESNO ROAD is complete — TDLR records show the project passed its required accessibility inspection in Jun 2018. The building is finished and very likely open.

Where is TRAMMEL FRESNO ROAD located?

TRAMMEL FRESNO ROAD is located at VICKSBURG BLVD TO FT BEND PKWY, Missouri City, TX, 77545, in Fort Bend County.

Who is the owner or developer of TRAMMEL FRESNO ROAD?

TXDOT DISTRICT: HOUSTON is the property owner/developer of record for TRAMMEL FRESNO ROAD, per its TDLR project registration.

Who is the architect or design firm for TRAMMEL FRESNO ROAD?

CIVILCORP LLC is the design firm of record for TRAMMEL FRESNO ROAD, according to its TDLR filing.

How much does TRAMMEL FRESNO ROAD cost and how big is it?

TRAMMEL FRESNO ROAD has an estimated construction value of $135K, based on its TDLR filing.

Scope of Work

Reconstruction of 2 lane existing roadway to 4 lane roadway with sidewalk

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

VICKSBURG BLVD TO FT BEND PKWY, Missouri City, TX, 77545

Location by street address

Watch all construction in 77545 (Missouri City)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Missouri City?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.