SHARETEA
SHARETEA is a renovation/alteration project at 3810 S. COOPER ST., #148, Arlington, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2017). The project has an estimated value of $179K.
๐Project Metrics
TDLR #EABPRJB7807136Project Closed
Project has been completed and closed
SHARETEA is a Renovation/Alteration project located at 3810 S. COOPER ST., #148, Arlington, TX 76015 in Arlington, Texas. The project has an estimated value of $179K. SHARETEA is the property owner and JBNN DESIGN & CONSTRUCTION INC. is the design firm of record. The project was registered with TDLR on December 20, 2016.
โFrequently Asked Questions
What is SHARETEA?
SHARETEA is a renovation/alteration project at 3810 S. COOPER ST., #148 in Arlington, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remodeled interior commercial lease space. Business toserve refreshment and other drinks.
Is SHARETEA open in Arlington?
Construction on SHARETEA is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2017. The building is finished and very likely open.
Where is SHARETEA located?
SHARETEA is located at 3810 S. COOPER ST., #148, Arlington, TX, 76015, in Tarrant County.
Who is the owner or developer of SHARETEA?
SHARETEA is the property owner/developer of record for SHARETEA, per its TDLR project registration.
Who is the architect or design firm for SHARETEA?
JBNN DESIGN & CONSTRUCTION INC. is the design firm of record for SHARETEA, according to its TDLR filing.
How much does SHARETEA cost and how big is it?
SHARETEA has an estimated construction value of $179K, based on its TDLR filing.
๐Scope of Work
Remodeled interior commercial lease space. Business toserve refreshment and other drinks.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Dec 20, 2016
Review Complete
Inspection Complete
Closed
Apr 1, 2017