BULLA
BULLA is a renovation/alteration project at 6181 LEGACY DRIVE SUITE 0180, Plano, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $1.2M.
๐Project Metrics
TDLR #EABPRJB7807762Review Complete
Design review complete, construction may proceed
BULLA is a Renovation/Alteration project located at 6181 LEGACY DRIVE SUITE 0180, Plano, TX 75024 in Plano, Texas. The project has an estimated value of $1.2M. MOON HOTEL LEGACY LTD. is the property owner and HOWELL BELANGER CASTELLI ARCHITECTS is the design firm of record. The project was registered with TDLR on January 3, 2017.
โFrequently Asked Questions
What is BULLA?
BULLA is a renovation/alteration project at 6181 LEGACY DRIVE SUITE 0180 in Plano, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: GROUND LEVEL INTERIOR TENANT FIT-OUT WITHIN AN EXISTINGNEWLY CONSTRUCTED MIXED USE BUILDING; MINOR REVISION TO
Is BULLA open in Plano?
BULLA is currently under construction in Plano, TX. Its current TDLR status is "Review Complete".
Where is BULLA located?
BULLA is located at 6181 LEGACY DRIVE SUITE 0180, Plano, TX, 75024, in Collin County.
Who is the owner or developer of BULLA?
MOON HOTEL LEGACY LTD. is the property owner/developer of record for BULLA, per its TDLR project registration.
Who is the architect or design firm for BULLA?
HOWELL BELANGER CASTELLI ARCHITECTS is the design firm of record for BULLA, according to its TDLR filing.
How much does BULLA cost and how big is it?
BULLA has an estimated construction value of $1.2M, based on its TDLR filing.
๐Scope of Work
GROUND LEVEL INTERIOR TENANT FIT-OUT WITHIN AN EXISTINGNEWLY CONSTRUCTED MIXED USE BUILDING; MINOR REVISION TO
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jan 3, 2017
Review Complete
Jan 3, 2017
Inspection Complete
Closed