Project intelligenceTDLR EABPRJB7808290New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

TOWN OF ENCHANTED OAKS PARK TRAIL in Mabank, TX

PO BOX 5019, Mabank, TX, 75147

Construction complete · Apr 2017Project Closed

TOWN OF ENCHANTED OAKS PARK TRAIL is a new construction project at PO BOX 5019, Mabank, in Henderson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2017). The project has an estimated value of $70K.

Estimated project value
$70K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jan 11, 201780 days across supplied datesApr 1, 2017

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    21 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    59 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75147 (Mabank)

One email per change. Unsubscribe in one click. Privacy.

TOWN OF ENCHANTED OAKS PARK TRAIL is a New Construction project located at PO BOX 5019, Mabank, TX 75147 in Mabank, Texas. The project has an estimated value of $70K. TOWN OF ENCHANTED OAKS is the property owner and HAYES ENGINEERING INC. is the design firm of record. The project was registered with TDLR on January 11, 2017.

Frequently Asked Questions

What is TOWN OF ENCHANTED OAKS PARK TRAIL?

TOWN OF ENCHANTED OAKS PARK TRAIL is a new construction project at PO BOX 5019 in Mabank, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Park trail

Is TOWN OF ENCHANTED OAKS PARK TRAIL open in Mabank?

Construction on TOWN OF ENCHANTED OAKS PARK TRAIL is complete — TDLR records show the project passed its required accessibility inspection in Apr 2017. The building is finished and very likely open.

Where is TOWN OF ENCHANTED OAKS PARK TRAIL located?

TOWN OF ENCHANTED OAKS PARK TRAIL is located at PO BOX 5019, Mabank, TX, 75147, in Henderson County.

Who is the owner or developer of TOWN OF ENCHANTED OAKS PARK TRAIL?

TOWN OF ENCHANTED OAKS is the property owner/developer of record for TOWN OF ENCHANTED OAKS PARK TRAIL, per its TDLR project registration.

Who is the architect or design firm for TOWN OF ENCHANTED OAKS PARK TRAIL?

HAYES ENGINEERING INC. is the design firm of record for TOWN OF ENCHANTED OAKS PARK TRAIL, according to its TDLR filing.

How much does TOWN OF ENCHANTED OAKS PARK TRAIL cost and how big is it?

TOWN OF ENCHANTED OAKS PARK TRAIL has an estimated construction value of $70K, based on its TDLR filing.

Scope of Work

Park trail

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

PO BOX 5019, Mabank, TX, 75147

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75147 (Mabank)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.