SOUTHWEST TRAILS PEDESTRIAN BRIDGE
๐Project Metrics
TDLR #EABPRJB7808603Project Closed
Project has been completed and closed
๐Scope of Work
Pedestrian Bridge across creek
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐Related City Permits
Building permits found at or near this location
Express- Repair and replace old roof docking boards fascia and shingles of 30+ years. Repair and replace siding around the entire home from dry rotted and removed siding. Tub shower conversion from tub to shower in the master bedroom.
Permanent meter rack service only FAs RELEASED FOR: 8405 BURRELL DR UNIT A & B 1524 VILLANOVA DR
Tunnel under foundation to replace cast iron pipe for one full bathroom and main drain line. Total lenght of pipe replaced is 45 feet and total length of tunnel is approximately 45 feet. 2 access holes will be made one in the front and one in the back.
Disconnect/reconnect to Upgrade main distribution panel.
Install new 5.525 kw rooftop solar system and 10kw energy storage system for existing residential only.