301 BAR REMODEL
301 BAR REMODEL is a renovation/alteration project at 23567 IH 10 WEST, San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $150K.
๐Project Metrics
TDLR #EABPRJB7808856Project Registered
Project has been registered with TDLR and is in pre-construction phase
301 BAR REMODEL is a Renovation/Alteration project located at 23567 IH 10 WEST, San Antonio, TX 78257 in San Antonio, Texas. The project has an estimated value of $150K. FRANK HAKSPIEL is the property owner and SA PARTNERSHIP is the design firm of record. The project was registered with TDLR on January 24, 2017.
โFrequently Asked Questions
What is 301 BAR REMODEL?
301 BAR REMODEL is a renovation/alteration project at 23567 IH 10 WEST in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Existing building to be remodeled into new bar. Add outdoor patio space.
Is 301 BAR REMODEL open in San Antonio?
301 BAR REMODEL is currently under construction in San Antonio, TX. Its current TDLR status is "Project Registered".
Where is 301 BAR REMODEL located?
301 BAR REMODEL is located at 23567 IH 10 WEST, San Antonio, TX, 78257, in Bexar County.
Who is the owner or developer of 301 BAR REMODEL?
FRANK HAKSPIEL is the property owner/developer of record for 301 BAR REMODEL, per its TDLR project registration.
Who is the architect or design firm for 301 BAR REMODEL?
SA PARTNERSHIP is the design firm of record for 301 BAR REMODEL, according to its TDLR filing.
How much does 301 BAR REMODEL cost and how big is it?
301 BAR REMODEL has an estimated construction value of $150K, based on its TDLR filing.
๐Scope of Work
Existing building to be remodeled into new bar. Add outdoor patio space.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jan 24, 2017
Review Complete
Inspection Complete
Closed