RR2W-1 GCC & TRAINING
RR2W-1 GCC & TRAINING is a renovation/alteration project at 501 DELL WAY Building 2W, Round Rock, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $1.4M.
๐Project Metrics
TDLR #EABPRJB7809045Project Registered
Project has been registered with TDLR and is in pre-construction phase
RR2W-1 GCC & TRAINING is a Renovation/Alteration project located at 501 DELL WAY Building 2W, Round Rock, TX 78682 in Round Rock, Texas. The project has an estimated value of $1.4M. DELL INC. is the property owner and CTA is the design firm of record. The project was registered with TDLR on January 24, 2017.
โFrequently Asked Questions
What is RR2W-1 GCC & TRAINING?
RR2W-1 GCC & TRAINING is a renovation/alteration project at 501 DELL WAY Building 2W in Round Rock, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remodel of existing office space into command center andtraining rooms
Is RR2W-1 GCC & TRAINING open in Round Rock?
RR2W-1 GCC & TRAINING is currently under construction in Round Rock, TX. Its current TDLR status is "Project Registered".
Where is RR2W-1 GCC & TRAINING located?
RR2W-1 GCC & TRAINING is located at 501 DELL WAY Building 2W, Round Rock, TX, 78682, in Williamson County.
Who is the owner or developer of RR2W-1 GCC & TRAINING?
DELL INC. is the property owner/developer of record for RR2W-1 GCC & TRAINING, per its TDLR project registration.
Who is the architect or design firm for RR2W-1 GCC & TRAINING?
CTA is the design firm of record for RR2W-1 GCC & TRAINING, according to its TDLR filing.
How much does RR2W-1 GCC & TRAINING cost and how big is it?
RR2W-1 GCC & TRAINING has an estimated construction value of $1.4M, based on its TDLR filing.
๐Scope of Work
Remodel of existing office space into command center andtraining rooms
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jan 24, 2017
Review Complete
Inspection Complete
Closed
๐Related Projects
๐คSame Owner
$34.9M total๐Nearby Projects
Within 1 km๐Related City Permits
Building permits found at or near this location
Replace Sewer/sanitary waste pipe under slab of home Water heater replacement
EPLAN - Structural Modification for future tenant - NOT FOR OCCUPANCY - 1st Floor
San Luis 1512-J-R New 2-Story Single Family Residence with (4) bedrooms (3) bathrooms Attached Garage Covered Patio & Porch Cafe & Game Room
Cap off water & wastewater Total demo of duplex 2200 sq ft circa 1966 ***The building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in Steps 5 & 6 of the Demolition webpage. ***
Rebuild of full service commercial restaurant with associated site work and landscaping.