FUEL MAXX 41
FUEL MAXX 41 is a new construction project at 500 SOUTH INTERSTATE 45, Fairfield, in Freestone County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2017). The project has an estimated value of $1.4M.
Project Metrics
TDLR #EABPRJB7809429Inspection Complete
Final inspection completed, awaiting project closure
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75840 (Fairfield)
One email per change. Unsubscribe in one click. Privacy.
FUEL MAXX 41 is a New Construction project located at 500 SOUTH INTERSTATE 45, Fairfield, TX 75840 in Fairfield, Texas. The project has an estimated value of $1.4M. NEW FAIRFIELD PROPERTY INC is the property owner and RSK ENGINEERING is the design firm of record. The project was registered with TDLR on January 31, 2017.
Frequently Asked Questions
What is FUEL MAXX 41?
FUEL MAXX 41 is a new construction project at 500 SOUTH INTERSTATE 45 in Fairfield, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 14880 SF ONE STORY BUILDING FOR RETAIL GAS STATION WHICHINCLUDES 3 FAST FOOD RESTAURANTS.
Is FUEL MAXX 41 open in Fairfield?
Construction on FUEL MAXX 41 is complete — TDLR records show the project passed its required accessibility inspection in Sep 2017. The building is finished and very likely open.
Where is FUEL MAXX 41 located?
FUEL MAXX 41 is located at 500 SOUTH INTERSTATE 45, Fairfield, TX, 75840, in Freestone County.
Who is the owner or developer of FUEL MAXX 41?
NEW FAIRFIELD PROPERTY INC is the property owner/developer of record for FUEL MAXX 41, per its TDLR project registration.
Who is the architect or design firm for FUEL MAXX 41?
RSK ENGINEERING is the design firm of record for FUEL MAXX 41, according to its TDLR filing.
How much does FUEL MAXX 41 cost and how big is it?
FUEL MAXX 41 has an estimated construction value of $1.4M, based on its TDLR filing.
Scope of Work
14880 SF ONE STORY BUILDING FOR RETAIL GAS STATION WHICHINCLUDES 3 FAST FOOD RESTAURANTS.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Compliance Timeline
Project Timeline
Filed
Jan 31, 2017
Review Complete
Inspection Complete
Sep 1, 2017
Closed
Related Projects
Property Owner
Design Firm
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Freestone County
Find General Contractors in FreestoneWatch all construction in 75840 (Fairfield)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.