Funding type
This project is privately funded, on private land for private use.
DBU BROWNSTONE RESIDENCE PHASES 6 & 7 in Dallas, TX
3000 MOUNTAIN CREEK PARKWAY, Dallas, TX, 75211
DBU BROWNSTONE RESIDENCE PHASES 6 & 7 is a new construction project at 3000 MOUNTAIN CREEK PARKWAY, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2018). The project has an estimated value of $4.5M.
- Estimated project value
- $4.5M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- Not supplied
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- —
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 4mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
29 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
486 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75211 (Dallas)
One email per change. Unsubscribe in one click. Privacy.
DBU BROWNSTONE RESIDENCE PHASES 6 & 7 is a New Construction project located at 3000 MOUNTAIN CREEK PARKWAY, Dallas, TX 75211 in Dallas, Texas. The project has an estimated value of $4.5M. DALLAS BAPTIST UNIVERSITY is the property owner and BMA ARCHITECTS is the design firm of record. The project was registered with TDLR on January 31, 2017.
Frequently Asked Questions
What is DBU BROWNSTONE RESIDENCE PHASES 6 & 7?
DBU BROWNSTONE RESIDENCE PHASES 6 & 7 is a new construction project at 3000 MOUNTAIN CREEK PARKWAY in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: A pair of two-story residential buildings consisting ofeight side-by-side townhomes. Phases 6 & 7 of the develo
Is DBU BROWNSTONE RESIDENCE PHASES 6 & 7 open in Dallas?
Construction on DBU BROWNSTONE RESIDENCE PHASES 6 & 7 is complete — TDLR records show the project passed its required accessibility inspection in Jun 2018. The building is finished and very likely open.
Where is DBU BROWNSTONE RESIDENCE PHASES 6 & 7 located?
DBU BROWNSTONE RESIDENCE PHASES 6 & 7 is located at 3000 MOUNTAIN CREEK PARKWAY, Dallas, TX, 75211, in Dallas County.
Who is the owner or developer of DBU BROWNSTONE RESIDENCE PHASES 6 & 7?
DALLAS BAPTIST UNIVERSITY is the property owner/developer of record for DBU BROWNSTONE RESIDENCE PHASES 6 & 7, per its TDLR project registration.
Who is the architect or design firm for DBU BROWNSTONE RESIDENCE PHASES 6 & 7?
BMA ARCHITECTS is the design firm of record for DBU BROWNSTONE RESIDENCE PHASES 6 & 7, according to its TDLR filing.
How much does DBU BROWNSTONE RESIDENCE PHASES 6 & 7 cost and how big is it?
DBU BROWNSTONE RESIDENCE PHASES 6 & 7 has an estimated construction value of $4.5M, based on its TDLR filing.
Scope of Work
A pair of two-story residential buildings consisting ofeight side-by-side townhomes. Phases 6 & 7 of the develo
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
3000 MOUNTAIN CREEK PARKWAY, Dallas, TX, 75211
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$100.2M totalWatch all construction in 75211 (Dallas)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Dallas?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.