LETS PHO
LETS PHO is a renovation/alteration project at 1701 FAIRWAY DR. STE 2 A, Alvin, in Brazoria County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2017). The project has an estimated value of $100K.
๐Project Metrics
TDLR #EABPRJB7813139Inspection Complete
Final inspection completed, awaiting project closure
LETS PHO is a Renovation/Alteration project located at 1701 FAIRWAY DR. STE 2 A, Alvin, TX 77511 in Alvin, Texas. The project has an estimated value of $100K. FAIRWAY 35 LLC is the property owner and TN ASSOCIATES LLC is the design firm of record. The project was registered with TDLR on March 20, 2017.
โFrequently Asked Questions
What is LETS PHO?
LETS PHO is a renovation/alteration project at 1701 FAIRWAY DR. STE 2 A in Alvin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: BUILD OUT OF 1,495 SF TO BE A RESTAURANT.
Is LETS PHO open in Alvin?
Construction on LETS PHO is complete โ TDLR records show the project passed its required accessibility inspection in Aug 2017. The building is finished and very likely open.
Where is LETS PHO located?
LETS PHO is located at 1701 FAIRWAY DR. STE 2 A, Alvin, TX, 77511, in Brazoria County.
Who is the owner or developer of LETS PHO?
FAIRWAY 35 LLC is the property owner/developer of record for LETS PHO, per its TDLR project registration.
Who is the architect or design firm for LETS PHO?
TN ASSOCIATES LLC is the design firm of record for LETS PHO, according to its TDLR filing.
How much does LETS PHO cost and how big is it?
LETS PHO has an estimated construction value of $100K, based on its TDLR filing.
๐Scope of Work
BUILD OUT OF 1,495 SF TO BE A RESTAURANT.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Mar 20, 2017
Review Complete
Inspection Complete
Aug 1, 2017
Closed