VILLAGES OF HIDDEN LAKE, PHASE 6A-2 in Pflugerville, TX
SW SILENT HARBOR & HARBOR POIN, Pflugerville, TX, 78660
VILLAGES OF HIDDEN LAKE, PHASE 6A-2 is a new construction project at SW SILENT HARBOR & HARBOR POIN, Pflugerville, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2017). The project has an estimated value of $800K.
- Estimated project value
- $800K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- Not supplied
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- —
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 6 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
2 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
183 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78660 (Pflugerville)
One email per change. Unsubscribe in one click. Privacy.
VILLAGES OF HIDDEN LAKE, PHASE 6A-2 is a New Construction project located at SW SILENT HARBOR & HARBOR POIN, Pflugerville, TX 78660 in Pflugerville, Texas. The project has an estimated value of $800K. RSI COMMUNITIES LLC is the property owner and PAPE-DAWSON ENGINEERS INC. is the design firm of record. The project was registered with TDLR on March 30, 2017.
Frequently Asked Questions
What is VILLAGES OF HIDDEN LAKE, PHASE 6A-2?
VILLAGES OF HIDDEN LAKE, PHASE 6A-2 is a new construction project at SW SILENT HARBOR & HARBOR POIN in Pflugerville, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of pedestrian ramps and sidewalks/ trails for one phase of a single-family residential subdivision
Is VILLAGES OF HIDDEN LAKE, PHASE 6A-2 open in Pflugerville?
Construction on VILLAGES OF HIDDEN LAKE, PHASE 6A-2 is complete — TDLR records show the project passed its required accessibility inspection in Oct 2017. The building is finished and very likely open.
Where is VILLAGES OF HIDDEN LAKE, PHASE 6A-2 located?
VILLAGES OF HIDDEN LAKE, PHASE 6A-2 is located at SW SILENT HARBOR & HARBOR POIN, Pflugerville, TX, 78660, in Travis County.
Who is the owner or developer of VILLAGES OF HIDDEN LAKE, PHASE 6A-2?
RSI COMMUNITIES LLC is the property owner/developer of record for VILLAGES OF HIDDEN LAKE, PHASE 6A-2, per its TDLR project registration.
Who is the architect or design firm for VILLAGES OF HIDDEN LAKE, PHASE 6A-2?
PAPE-DAWSON ENGINEERS INC. is the design firm of record for VILLAGES OF HIDDEN LAKE, PHASE 6A-2, according to its TDLR filing.
How much does VILLAGES OF HIDDEN LAKE, PHASE 6A-2 cost and how big is it?
VILLAGES OF HIDDEN LAKE, PHASE 6A-2 has an estimated construction value of $800K, based on its TDLR filing.
Scope of Work
Construction of pedestrian ramps and sidewalks/ trails for one phase of a single-family residential subdivision
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
SW SILENT HARBOR & HARBOR POIN, Pflugerville, TX, 78660
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$56.8M totalWatch all construction in 78660 (Pflugerville)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Pflugerville?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.