OXY 5GW LEVEL 4
OXY 5GW LEVEL 4 is a renovation/alteration project at 5 GREENWAY PLAZA, LEVEL 4, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jul 2017). The project has an estimated value of $600K.
๐Project Metrics
TDLR #EABPRJB7815052Project Closed
Project has been completed and closed
OXY 5GW LEVEL 4 is a Renovation/Alteration project located at 5 GREENWAY PLAZA, LEVEL 4, Houston, TX 77046 in Houston, Texas. The project has an estimated value of $600K. GWP EAST LLC PARKWAY PROPERTY is the property owner and PLANNING DESIGN RESEARCH is the design firm of record. The project was registered with TDLR on April 14, 2017.
โFrequently Asked Questions
What is OXY 5GW LEVEL 4?
OXY 5GW LEVEL 4 is a renovation/alteration project at 5 GREENWAY PLAZA, LEVEL 4 in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation to existing suite on a single tenant floor.
Is OXY 5GW LEVEL 4 open in Houston?
Construction on OXY 5GW LEVEL 4 is complete โ TDLR records show the project passed its required accessibility inspection in Jul 2017. The building is finished and very likely open.
Where is OXY 5GW LEVEL 4 located?
OXY 5GW LEVEL 4 is located at 5 GREENWAY PLAZA, LEVEL 4, Houston, TX, 77046, in Harris County.
Who is the owner or developer of OXY 5GW LEVEL 4?
GWP EAST LLC PARKWAY PROPERTY is the property owner/developer of record for OXY 5GW LEVEL 4, per its TDLR project registration.
Who is the architect or design firm for OXY 5GW LEVEL 4?
PLANNING DESIGN RESEARCH is the design firm of record for OXY 5GW LEVEL 4, according to its TDLR filing.
How much does OXY 5GW LEVEL 4 cost and how big is it?
OXY 5GW LEVEL 4 has an estimated construction value of $600K, based on its TDLR filing.
๐Scope of Work
Renovation to existing suite on a single tenant floor.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 14, 2017
Review Complete
Inspection Complete
Closed
Jul 1, 2017