QTS DFW DC2 DATA HALL 2.2
QTS DFW DC2 DATA HALL 2.2 is a renovation/alteration project at 6431 LONGHORN DRIVE, Irving, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2018). The project has an estimated value of $16.0M.
๐Project Metrics
TDLR #EABPRJB7817442Project Closed
Project has been completed and closed
QTS DFW DC2 DATA HALL 2.2 is a Renovation/Alteration project located at 6431 LONGHORN DRIVE, Irving, TX 75063 in Irving, Texas. The project has an estimated value of $16.0M. QUALITY INVESTMENT PROPERTIES IRVING LLC is the property owner and CORGAN ASSOCIATES is the design firm of record. The project was registered with TDLR on May 18, 2017.
โFrequently Asked Questions
What is QTS DFW DC2 DATA HALL 2.2?
QTS DFW DC2 DATA HALL 2.2 is a renovation/alteration project at 6431 LONGHORN DRIVE in Irving, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation to existing building 2 area, level 1
Is QTS DFW DC2 DATA HALL 2.2 open in Irving?
Construction on QTS DFW DC2 DATA HALL 2.2 is complete โ TDLR records show the project passed its required accessibility inspection in Mar 2018. The building is finished and very likely open.
Where is QTS DFW DC2 DATA HALL 2.2 located?
QTS DFW DC2 DATA HALL 2.2 is located at 6431 LONGHORN DRIVE, Irving, TX, 75063, in Dallas County.
Who is the owner or developer of QTS DFW DC2 DATA HALL 2.2?
QUALITY INVESTMENT PROPERTIES IRVING LLC is the property owner/developer of record for QTS DFW DC2 DATA HALL 2.2, per its TDLR project registration.
Who is the architect or design firm for QTS DFW DC2 DATA HALL 2.2?
CORGAN ASSOCIATES is the design firm of record for QTS DFW DC2 DATA HALL 2.2, according to its TDLR filing.
How much does QTS DFW DC2 DATA HALL 2.2 cost and how big is it?
QTS DFW DC2 DATA HALL 2.2 has an estimated construction value of $16.0M, based on its TDLR filing.
๐Scope of Work
Renovation to existing building 2 area, level 1
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
May 18, 2017
Review Complete
Inspection Complete
Closed
Mar 1, 2018