DAVID YURMAN is a renovation/alteration project at 11600 CENTURY OAKS TERRACE,120, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2017). The project has an estimated value of $475K.
Final inspection completed, awaiting project closure
DAVID YURMAN is a Renovation/Alteration project located at 11600 CENTURY OAKS TERRACE,120, Austin, TX 78758 in Austin, Texas. The project has an estimated value of $475K. SIMON PROPERTIES is the property owner and CALLISONRTKL is the design firm of record. The project was registered with TDLR on June 1, 2017.
DAVID YURMAN is a renovation/alteration project at 11600 CENTURY OAKS TERRACE,120 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Non load bearing partitions, interior finishes, ceilingwork, storefront, finishes, Mechanical, Electrical, Plum
Construction on DAVID YURMAN is complete โ TDLR records show the project passed its required accessibility inspection in Oct 2017. The building is finished and very likely open.
DAVID YURMAN is located at 11600 CENTURY OAKS TERRACE,120, Austin, TX, 78758, in Travis County.
SIMON PROPERTIES is the property owner/developer of record for DAVID YURMAN, per its TDLR project registration.
CALLISONRTKL is the design firm of record for DAVID YURMAN, according to its TDLR filing.
DAVID YURMAN has an estimated construction value of $475K, based on its TDLR filing.
Non load bearing partitions, interior finishes, ceilingwork, storefront, finishes, Mechanical, Electrical, Plum
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Jun 1, 2017
Review Complete
Inspection Complete
Oct 1, 2017
Closed
Building permits found at or near this location
7 DAY - Fire rebuild on levels 2-4 at existing MF apartments -OVA
7 DAY - Fire rebuild on levels 2-4 at existing MF apartments -OVA
REPLACE THE SERVICE FOR OFFICE COMPLEX INCLUDES 4 OCCUPIED OFFICES- THE SERVICE CAUGHT FIRE AND NEEDS NEW GUTTER TAP BOX DISCONNECTS AND METERS; NO ESPA NEEDED- PEC ELECTRIC SVC PROVIDER
7 DAY - Fire rebuild on levels 2-4 at existing MF apartments -OVA
7 DAY - Fire rebuild on levels 2-4 at existing MF apartments -OVA