KELLER WILLIAMS REALTY
KELLER WILLIAMS REALTY is a renovation/alteration project at 1221 S MOPAC EXPY SUITE 400, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $707K.
๐Project Metrics
TDLR #EABPRJB7821354Review Complete
Design review complete, construction may proceed
KELLER WILLIAMS REALTY is a Renovation/Alteration project located at 1221 S MOPAC EXPY SUITE 400, Austin, TX 78746 in Austin, Texas. The project has an estimated value of $707K. G&I VII BARTON SKYWAY LP is the property owner and UNHINGED STUDIO is the design firm of record. The project was registered with TDLR on July 18, 2017.
โFrequently Asked Questions
What is KELLER WILLIAMS REALTY?
KELLER WILLIAMS REALTY is a renovation/alteration project at 1221 S MOPAC EXPY SUITE 400 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: To renovate an existing building for commercial use.
Is KELLER WILLIAMS REALTY open in Austin?
KELLER WILLIAMS REALTY is currently under construction in Austin, TX. Its current TDLR status is "Review Complete".
Where is KELLER WILLIAMS REALTY located?
KELLER WILLIAMS REALTY is located at 1221 S MOPAC EXPY SUITE 400, Austin, TX, 78746, in Travis County.
Who is the owner or developer of KELLER WILLIAMS REALTY?
G&I VII BARTON SKYWAY LP is the property owner/developer of record for KELLER WILLIAMS REALTY, per its TDLR project registration.
Who is the architect or design firm for KELLER WILLIAMS REALTY?
UNHINGED STUDIO is the design firm of record for KELLER WILLIAMS REALTY, according to its TDLR filing.
How much does KELLER WILLIAMS REALTY cost and how big is it?
KELLER WILLIAMS REALTY has an estimated construction value of $707K, based on its TDLR filing.
๐Scope of Work
To renovate an existing building for commercial use.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jul 18, 2017
Review Complete
Jul 18, 2017
Inspection Complete
Closed
๐Related Projects
๐คSame Owner
$40.7M total๐๏ธSame Design Firm
$3.1M total๐Related City Permits
Building permits found at or near this location
Addition of heaters on rooftop interior work on the first floor area behind the Studio
Replacement of complete existing central heat and air system with or without duct work Installing 3.5 Ton 15 Seer Gas System in a closet.
Replacement of an existing water heater
Plumbing for New Construction of SFR in the ETJ 2003 sq ft
Replacement of complete existing central heat and air system with or without duct work Replacing like for like 3 ton condenser coil and gas furnace.