Zabalist
ZabalistTexas Construction
๐Ÿ  Home
๐Ÿ“‹ Directory
๐Ÿ’Ž Pricing๐Ÿ“Š Data
Sign InCreate Account
Zabalist
ZabalistTexas Construction

The most comprehensive Texas construction intelligence platform. Search verified contractors, track permits, and explore projects across the state.

โœ“ Verified DataFree to Search

Directory

  • Contractors
  • Builders
  • Architects
  • Developers
  • Property Owners

Construction Data

  • Building Permits
  • State Projects
  • Site Plans
  • Texas RFPs & Bids
  • Browse by City
  • Browse by County

Free Tools

  • Contractor License Lookup
  • Permit Cost Estimator
  • Free Contractor Badges
  • About Zabalist
  • Contact Us

ยฉ 2026 Smart Austin LLC d/b/a Moon Sherpa Labs. All rights reserved.

TermsPrivacyCookiesDo Not SellAccessibilityDMCAData Sources
Data from verified public sources. Not affiliated with any government agency.
  1. Home
  2. /
  3. Projects
  4. /
  5. Hays
Construction complete ยท Sep 2018๐ŸProject Closed๐Ÿ—๏ธ New Construction๐Ÿ’ต This project is privately funded, on private land for private use.

SHELL BUILDING - BUILDING ""A""

120 RIVERWALK DR., San Marcos, TX 78666, San Marcos, TX, 78666
Completed100%

๐Ÿ“ŠProject Metrics

TDLR #EABPRJB7821500
$300K
Project Value
โ€”
Square Feet
โ€”
Cost/SqFt
1 year
Duration
Registered:Jul 19, 2017
Start:Sep 1, 2017
Target:Sep 1, 2018
๐Ÿ

Project Closed

Project has been completed and closed

SHELL BUILDING - BUILDING ""A"" is a New Construction project located at 120 RIVERWALK DR., San Marcos, TX 78666 in San Marcos, Texas. The project has an estimated value of $300K. ROBERT MCDONALD III is the property owner and MICHAEL WILLS ARCHITECT is the design firm of record. The project was registered with TDLR on July 19, 2017.

๐Ÿ“‹Scope of Work

Build a 6,470 SF Shell Building

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

๐Ÿ“…Compliance Timeline

Project Registered
July 19, 2017
Project Closed
September 1, 2018
Construction Start
September 1, 2017
Expected Completion
September 1, 2018

๐Ÿ“…Project Timeline

Filed

Jul 19, 2017

Review Complete

Inspection Complete

Closed

Sep 1, 2018

๐Ÿ”—Related Projects

๐Ÿ‘คSame Owner

$3.6M total
SHELL BUILDING - BUILDING ""B""
San Marcosยท$200K

๐Ÿ›๏ธSame Design Firm

$14.8M total
SHELL BUILDING - BUILDING ""B""
San Marcosยท$200K
ALPHA DELTA PI MEETING HOUSE
San Marcosยท$750K
VAN DE WALLE DENTISTRY
San Marcosยท$500K

๐Ÿ“„Related City Permits

Building permits found at or near this location

1206 E 52ND ST BLDG B

Interior Renovation to (5) Units construct Fire Rated Partitions between Units Covert Existing Tubs to Showers replace Existing Counter Tops cabinets fixtures and equipment with new. - Replace existing lighting fixtures switches and outlets as needed. No new circuits or service changes. (5) Applications

ActiveElectrical PermitRemodelJun 2026
View Details
2025-160912 EP
๐Ÿ”งPinPoint Electrical Systems
1206 E 52ND ST BLDG B

Interior Renovation to (5) Units construct Fire Rated Partitions between Units Covert Existing Tubs to Showers replace Existing Counter Tops cabinets fixtures and equipment with new. - Replace existing lighting fixtures switches and outlets as needed. No new circuits or service changes. (5) Applications

ActiveElectrical PermitRemodelJun 2026
View Details
2025-160916 EP
๐Ÿ”งPinPoint Electrical Systems
1206 E 52ND ST BLDG B

Interior Renovation to (5) Units construct Fire Rated Partitions between Units Covert Existing Tubs to Showers replace Existing Counter Tops cabinets fixtures and equipment with new. - Replace existing lighting fixtures switches and outlets as needed. No new circuits or service changes. (5) Applications

ActiveElectrical PermitRemodelJun 2026
View Details
2025-160910 EP
๐Ÿ”งPinPoint Electrical Systems
1209 TAYLOR ST

Spot repair on existing sewer yard line. Less than 10 ft.

ActivePlumbing PermitRepairJun 2026
View Details
2026-077796 PP
๐Ÿ”งGary Werner Company
1206 E 52ND ST BLDG B

Interior Renovation to (5) Units construct Fire Rated Partitions between Units Covert Existing Tubs to Showers replace Existing Counter Tops cabinets fixtures and equipment with new. - Replace existing lighting fixtures switches and outlets as needed. No new circuits or service changes. (5) Applications

ActiveElectrical PermitRemodelJun 2026
View Details
2025-160914 EP
๐Ÿ”งPinPoint Electrical Systems

Quick Actions

View on TDLR
TDLR ID: EABPRJB7821500

Property Owner

๐Ÿ‘ค
Robert McDonald III
Contact: Registered by TDLR
9 projects ยท $3.6M
View company profile
ROBERT MCDONALD 9811 S IH 35 BLDG 3, STE 100, AUSTIN, TX 75744
(512) 517-7337

Design Firm

๐Ÿ›๏ธ
Michael Wills - Architect
28 projects ยท $14.8M
View company profile
MICHAEL WILLS 503 W SAN ANTONIO ST, SAN MARCOS, TX 78666
(512) 396-9829

Registered Accessibility Specialist

๐Ÿ“‹
DAVID M,MCMILLAN
RAS #78
1235 RIO LINDA ST, SAN ANTONIO, TX 78245
(210) 710-7259

Explore Area

๐Ÿ™๏ธ
San Marcos
View city projects
๐Ÿ—บ๏ธ
Hays County
View county projects
๐Ÿ“ฎ
ZIP 78666
View zip code projects

Find Professionals

๐Ÿ”จ
Contractors in San Marcos
Licensed contractors directory
๐Ÿ—๏ธ
Builders in San Marcos
Home & commercial builders
๐Ÿ“
Architects in San Marcos
Architecture & design firms

Need a contractor for this project?

Browse verified general contractors active in Hays County

Find General Contractors in Hays

Get alerts for Hays

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists
Explore All Projects