Project intelligenceTDLR EABPRJB7822216New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

FM 5151 HWY 37 SIDEWALK IMPROVEMENTS

310 WEST COKE ROAD, Winnsboro, TX, 75494

Construction complete · Aug 2018Project Closed

FM 5151 HWY 37 SIDEWALK IMPROVEMENTS is a new construction project at 310 WEST COKE ROAD, Winnsboro, in Wood County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2018). The project has an estimated value of $690K.

Estimated project value
$690K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
7 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jul 31, 2017366 days across supplied datesAug 1, 2018

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    154 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    212 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75494 (Winnsboro)

One email per change. Unsubscribe in one click. Privacy.

FM 5151 HWY 37 SIDEWALK IMPROVEMENTS is a New Construction project located at 310 WEST COKE ROAD, Winnsboro, TX 75494 in Winnsboro, Texas. The project has an estimated value of $690K. CRAIG LINDHOLM CITY OF WINNSBORO is the property owner and HAYTER ENGINEERING INC. is the design firm of record. The project was registered with TDLR on July 31, 2017.

Frequently Asked Questions

What is FM 5151 HWY 37 SIDEWALK IMPROVEMENTS?

FM 5151 HWY 37 SIDEWALK IMPROVEMENTS is a new construction project at 310 WEST COKE ROAD in Winnsboro, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Installation of 1,800 lf 5' wide concrete sidewalk, 2 pedestrian bridges, culverts and required safety/accessibi

Is FM 5151 HWY 37 SIDEWALK IMPROVEMENTS open in Winnsboro?

Construction on FM 5151 HWY 37 SIDEWALK IMPROVEMENTS is complete — TDLR records show the project passed its required accessibility inspection in Aug 2018. The building is finished and very likely open.

Where is FM 5151 HWY 37 SIDEWALK IMPROVEMENTS located?

FM 5151 HWY 37 SIDEWALK IMPROVEMENTS is located at 310 WEST COKE ROAD, Winnsboro, TX, 75494, in Wood County.

Who is the owner or developer of FM 5151 HWY 37 SIDEWALK IMPROVEMENTS?

CRAIG LINDHOLM CITY OF WINNSBORO is the property owner/developer of record for FM 5151 HWY 37 SIDEWALK IMPROVEMENTS, per its TDLR project registration.

Who is the architect or design firm for FM 5151 HWY 37 SIDEWALK IMPROVEMENTS?

HAYTER ENGINEERING INC. is the design firm of record for FM 5151 HWY 37 SIDEWALK IMPROVEMENTS, according to its TDLR filing.

How much does FM 5151 HWY 37 SIDEWALK IMPROVEMENTS cost and how big is it?

FM 5151 HWY 37 SIDEWALK IMPROVEMENTS has an estimated construction value of $690K, based on its TDLR filing.

Scope of Work

Installation of 1,800 lf 5' wide concrete sidewalk, 2 pedestrian bridges, culverts and required safety/accessibi

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

310 WEST COKE ROAD, Winnsboro, TX, 75494

32.95002, -95.29975

Watch all construction in 75494 (Winnsboro)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Winnsboro?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.