THE CROSSING @ LICK CREEK, PHASE 3 is a new construction project at 4816 COOPERS HAWK DRIVE, College Station, in Brazos County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2018). The project has an estimated value of $91K.
Project has been completed and closed
THE CROSSING @ LICK CREEK, PHASE 3 is a New Construction project located at 4816 COOPERS HAWK DRIVE, College Station, TX 77845 in College Station, Texas. The project has an estimated value of $91K. TDI-BROOKS DEVELOPMENT LLC is the property owner and SCHULTZ ENGINEERING LLC is the design firm of record. The project was registered with TDLR on August 18, 2017.
THE CROSSING @ LICK CREEK, PHASE 3 is a new construction project at 4816 COOPERS HAWK DRIVE in College Station, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Sidewalks within the Right of Way of phase 3 of an existing subdivision
Construction on THE CROSSING @ LICK CREEK, PHASE 3 is complete โ TDLR records show the project passed its required accessibility inspection in Jun 2018. The building is finished and very likely open.
THE CROSSING @ LICK CREEK, PHASE 3 is located at 4816 COOPERS HAWK DRIVE, College Station, TX, 77845, in Brazos County.
TDI-BROOKS DEVELOPMENT LLC is the property owner/developer of record for THE CROSSING @ LICK CREEK, PHASE 3, per its TDLR project registration.
SCHULTZ ENGINEERING LLC is the design firm of record for THE CROSSING @ LICK CREEK, PHASE 3, according to its TDLR filing.
THE CROSSING @ LICK CREEK, PHASE 3 has an estimated construction value of $91K, based on its TDLR filing.
Sidewalks within the Right of Way of phase 3 of an existing subdivision
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Aug 18, 2017
Review Complete
Inspection Complete
Closed
Jun 1, 2018
Need a contractor for this project?
Browse verified general contractors active in Brazos County
Find General Contractors in Brazos