Project intelligenceTDLR EABPRJB7823906Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

S.C.G.C. - FINISH OUT & RENOVATION

4949 VILLAGE FAIR DR., Dallas, TX, 75224

Construction complete · Dec 2017Inspection Complete

S.C.G.C. - FINISH OUT & RENOVATION is a renovation/alteration project at 4949 VILLAGE FAIR DR., Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2017). The project has an estimated value of $2.0M.

Estimated project value
$2.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Aug 24, 201799 days across supplied datesDec 1, 2017

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    8 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    91 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75224 (Dallas)

One email per change. Unsubscribe in one click. Privacy.

S.C.G.C. - FINISH OUT & RENOVATION is a Renovation/Alteration project located at 4949 VILLAGE FAIR DR., Dallas, TX 75224 in Dallas, Texas. The project has an estimated value of $2.0M. DALLAS ISD is the property owner and JAL DESIGN GROUP is the design firm of record. The project was registered with TDLR on August 24, 2017.

Frequently Asked Questions

What is S.C.G.C. - FINISH OUT & RENOVATION?

S.C.G.C. - FINISH OUT & RENOVATION is a renovation/alteration project at 4949 VILLAGE FAIR DR. in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Shell Space - Finish-out and Select Renovations of existing school.

Is S.C.G.C. - FINISH OUT & RENOVATION open in Dallas?

Construction on S.C.G.C. - FINISH OUT & RENOVATION is complete — TDLR records show the project passed its required accessibility inspection in Dec 2017. The building is finished and very likely open.

Where is S.C.G.C. - FINISH OUT & RENOVATION located?

S.C.G.C. - FINISH OUT & RENOVATION is located at 4949 VILLAGE FAIR DR., Dallas, TX, 75224, in Dallas County.

Who is the owner or developer of S.C.G.C. - FINISH OUT & RENOVATION?

DALLAS ISD is the property owner/developer of record for S.C.G.C. - FINISH OUT & RENOVATION, per its TDLR project registration.

Who is the architect or design firm for S.C.G.C. - FINISH OUT & RENOVATION?

JAL DESIGN GROUP is the design firm of record for S.C.G.C. - FINISH OUT & RENOVATION, according to its TDLR filing.

How much does S.C.G.C. - FINISH OUT & RENOVATION cost and how big is it?

S.C.G.C. - FINISH OUT & RENOVATION has an estimated construction value of $2.0M, based on its TDLR filing.

Scope of Work

Shell Space - Finish-out and Select Renovations of existing school.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Watch all construction in 75224 (Dallas)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Get alerts for Dallas

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists