817 HOTEL is a renovation/alteration project at 910 N COLLINS STREET, Arlington, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2018). The project has an estimated value of $1.0M.
๐Project Metrics
TDLR #EABPRJB7824239Project Closed
Project has been completed and closed
817 HOTEL is a Renovation/Alteration project located at 910 N COLLINS STREET, Arlington, TX 76011 in Arlington, Texas. The project has an estimated value of $1.0M. GLI HOSPITALITY is the property owner and LBL ARCHITECTS is the design firm of record. The project was registered with TDLR on August 30, 2017.
โFrequently Asked Questions
What is 817 HOTEL?
817 HOTEL is a renovation/alteration project at 910 N COLLINS STREET in Arlington, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: RENOVATIONS TO LOBBY, HOTEL ROOMS, CORRIDORS, BREAKFASTAREA, PUBLIC TOILETS VAR175
Is 817 HOTEL open in Arlington?
Construction on 817 HOTEL is complete โ TDLR records show the project passed its required accessibility inspection in Aug 2018. The building is finished and very likely open.
Where is 817 HOTEL located?
817 HOTEL is located at 910 N COLLINS STREET, Arlington, TX, 76011, in Tarrant County.
Who is the owner or developer of 817 HOTEL?
GLI HOSPITALITY is the property owner/developer of record for 817 HOTEL, per its TDLR project registration.
Who is the architect or design firm for 817 HOTEL?
LBL ARCHITECTS is the design firm of record for 817 HOTEL, according to its TDLR filing.
How much does 817 HOTEL cost and how big is it?
817 HOTEL has an estimated construction value of $1.0M, based on its TDLR filing.
๐Scope of Work
RENOVATIONS TO LOBBY, HOTEL ROOMS, CORRIDORS, BREAKFASTAREA, PUBLIC TOILETS VAR175
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 30, 2017
Review Complete
Inspection Complete
Closed
Aug 31, 2018