PARSLEY ENERGY
PARSLEY ENERGY is a renovation/alteration project at 301 CONGRESS AVE SUITE 900, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2018). The project has an estimated value of $1.0M.
๐Project Metrics
TDLR #EABPRJB7824362Project Closed
Project has been completed and closed
PARSLEY ENERGY is a Renovation/Alteration project located at 301 CONGRESS AVE SUITE 900, Austin, TX 78701 in Austin, Texas. The project has an estimated value of $1.0M. HPI REAL ESTATE MANAGEMENT INC. is the property owner and STG DESIGN is the design firm of record. The project was registered with TDLR on September 1, 2017.
โFrequently Asked Questions
What is PARSLEY ENERGY?
PARSLEY ENERGY is a renovation/alteration project at 301 CONGRESS AVE SUITE 900 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior Renovation
Is PARSLEY ENERGY open in Austin?
Construction on PARSLEY ENERGY is complete โ TDLR records show the project passed its required accessibility inspection in Mar 2018. The building is finished and very likely open.
Where is PARSLEY ENERGY located?
PARSLEY ENERGY is located at 301 CONGRESS AVE SUITE 900, Austin, TX, 78701, in Travis County.
Who is the owner or developer of PARSLEY ENERGY?
HPI REAL ESTATE MANAGEMENT INC. is the property owner/developer of record for PARSLEY ENERGY, per its TDLR project registration.
Who is the architect or design firm for PARSLEY ENERGY?
STG DESIGN is the design firm of record for PARSLEY ENERGY, according to its TDLR filing.
How much does PARSLEY ENERGY cost and how big is it?
PARSLEY ENERGY has an estimated construction value of $1.0M, based on its TDLR filing.
๐Scope of Work
Interior Renovation
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Sep 1, 2017
Review Complete
Inspection Complete
Closed
Mar 1, 2018
๐Related Projects
๐คSame Owner
$1.1M total๐Related City Permits
Building permits found at or near this location
Replace kitchen outlets with GFCI bring garbage disposal hook up to code Install CIP concrete ramp and landing at front door to driveway.
Primary bathroom guest bathroom and powder bathroom renovations including electrical fixtures and flooring throughout the unit. No structural or exterior work is proposed- Suite 5402
TPO overlay over existing metal r-panel roof to include new metal trim gutters and downspouts. Existing auto parts store.
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work