Project intelligenceTDLR EABPRJB8801768New Construction
Funding type

This project is privately funded, on private land for private use.

ETBU UNIV PARK ROW HOUSES PHASE II in Marshall, TX

ONE TIGER DRIVE, Marshall, TX, 75670

Construction complete · Jul 2018Project Closed

ETBU UNIV PARK ROW HOUSES PHASE II is a new construction project at ONE TIGER DRIVE, Marshall, in Harrison County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jul 2018). The project has an estimated value of $1.8M.

Estimated project value
$1.8M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
9 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Sep 29, 2017275 days across supplied datesJul 1, 2018

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    2 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    273 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75670 (Marshall)

One email per change. Unsubscribe in one click. Privacy.

ETBU UNIV PARK ROW HOUSES PHASE II is a New Construction project located at ONE TIGER DRIVE, Marshall, TX 75670 in Marshall, Texas. The project has an estimated value of $1.8M. EAST TEXAS BAPTIST UNIVERSITY is the property owner and BMA ARCHITECTS is the design firm of record. The project was registered with TDLR on September 29, 2017.

Frequently Asked Questions

What is ETBU UNIV PARK ROW HOUSES PHASE II?

ETBU UNIV PARK ROW HOUSES PHASE II is a new construction project at ONE TIGER DRIVE in Marshall, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Anew 2-story student residence building consisting of six side-by-side 2-story dwelling units and a 1-story grou

Is ETBU UNIV PARK ROW HOUSES PHASE II open in Marshall?

Construction on ETBU UNIV PARK ROW HOUSES PHASE II is complete — TDLR records show the project passed its required accessibility inspection in Jul 2018. The building is finished and very likely open.

Where is ETBU UNIV PARK ROW HOUSES PHASE II located?

ETBU UNIV PARK ROW HOUSES PHASE II is located at ONE TIGER DRIVE, Marshall, TX, 75670, in Harrison County.

Who is the owner or developer of ETBU UNIV PARK ROW HOUSES PHASE II?

EAST TEXAS BAPTIST UNIVERSITY is the property owner/developer of record for ETBU UNIV PARK ROW HOUSES PHASE II, per its TDLR project registration.

Who is the architect or design firm for ETBU UNIV PARK ROW HOUSES PHASE II?

BMA ARCHITECTS is the design firm of record for ETBU UNIV PARK ROW HOUSES PHASE II, according to its TDLR filing.

How much does ETBU UNIV PARK ROW HOUSES PHASE II cost and how big is it?

ETBU UNIV PARK ROW HOUSES PHASE II has an estimated construction value of $1.8M, based on its TDLR filing.

Scope of Work

Anew 2-story student residence building consisting of six side-by-side 2-story dwelling units and a 1-story grou

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

ONE TIGER DRIVE, Marshall, TX, 75670

Loading location map…
32.55374, -94.37478

Watch all construction in 75670 (Marshall)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Marshall?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.