Zabalist
ZabalistTexas Construction
๐Ÿ  Home
๐Ÿ“‹ Directory
๐Ÿ’Ž Pricing๐Ÿ“Š Data
Sign InCreate Account
Zabalist
ZabalistTexas Construction

The most comprehensive Texas construction intelligence platform. Search verified contractors, track permits, and explore projects across the state.

โœ“ Verified DataFree to Search

Directory

  • Contractors
  • Builders
  • Architects
  • Developers
  • Property Owners

Construction Data

  • Building Permits
  • State Projects
  • Site Plans
  • Texas RFPs & Bids
  • Browse by City
  • Browse by County

Free Tools

  • Contractor License Lookup
  • Permit Cost Estimator
  • Free Contractor Badges
  • About Zabalist
  • Contact Us

ยฉ 2026 Smart Austin LLC d/b/a Moon Sherpa Labs. All rights reserved.

TermsPrivacyCookiesDo Not SellAccessibilityDMCAData Sources
Data from verified public sources. Not affiliated with any government agency.
  1. Home
  2. /
  3. Projects
  4. /
  5. Travis
Construction complete ยท Nov 2018โœ…Inspection Complete๐Ÿ—๏ธ New Construction๐Ÿ’ต This project is privately funded, on private land for private use.

AANP VEGA AVE.

5901 VEGA AVE., Austin, TX 78753, Austin, TX, 78753
Final Inspection85%

๐Ÿ“ŠProject Metrics

TDLR #EABPRJB8801885
$9.0M
Project Value
โ€”
Square Feet
โ€”
Cost/SqFt
1 year
Duration
Registered:Oct 2, 2017
Start:Nov 1, 2017
Target:Nov 1, 2018
โœ…

Inspection Complete

Final inspection completed, awaiting project closure

AANP VEGA AVE. is a New Construction project located at 5901 VEGA AVE., Austin, TX 78753 in Austin, Texas. The project has an estimated value of $9.0M. AANP is the property owner and STUDIO 8 ARCHITECTS is the design firm of record. The project was registered with TDLR on October 2, 2017.

๐Ÿ“‹Scope of Work

Ground up office construction

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

๐Ÿ“…Compliance Timeline

Project Registered
October 2, 2017
Inspection Complete
November 1, 2018
Construction Start
November 1, 2017
Expected Completion
November 1, 2018

๐Ÿ“…Project Timeline

Filed

Oct 2, 2017

Review Complete

Inspection Complete

Nov 1, 2018

Closed

๐Ÿ”—Related Projects

๐Ÿ›๏ธSame Design Firm

$1.22B total
WESTINGHOUSE BUSINESS CENTER PHASE 1
Georgetownยท$8.0M
2600 S 1ST
Austinยท$2.8M
WONDER WORLD MEDICAL SQUARE
San Marcosยท$3.0M
CITY OF AUSTIN MUNICIPAL COURTHOUSE
Austinยท$9.4M

๐Ÿ“„Related City Permits

Building permits found at or near this location

5901 TERRAVISTA DR

Replacement of complete existing central heat and air system with or without duct work REPLACE EXISTING HVAC SYSTEM

ActiveMechanical PermitChange OutJun 2026
View Details
2026-071849 MP
๐Ÿ”งWoods Comfort Systems
5901 TAUNTE DR

Plumbing for New Construction of SFR in the ETJ 2278 sq ft

ActivePlumbing PermitNewMay 2026
View Details
2026-065521 PP
๐Ÿ”งVictory Plumbing Company
5901 TAUNTE DR

New Service for SFR in ETJ.

ActiveElectrical PermitNewMay 2026
View Details
2026-067133 EP
๐Ÿ”งAustin Lanehart Electric Co., Inc.
5901 FAIRLANE DR

Total demo of sfr 1300 sqft circa 1956

FinalPlumbing PermitDemolitionMay 2026
View Details
2026-032666 PP
๐Ÿ”งNueva Era Plumbing Services LLC
5901 LOS DIOS PL

Excavate and access damaged drain system by coordinating with Bats Foundation to tunnel approximately 15 from the exterior of the home to the garage area. Expose the broken 3 wye fitting where the kitchen sink and laundry line connect to the main sewer line. Remove the damaged section and install new PVC fittings and piping to complete a proper repair with correct alignment and slope. Ensure sufficient exposure of piping to allow for a secure and code-compliant repair. Excavate and expose an additional break located at the cleanout exiting the home. Remove damaged components and install a new cleanout assembly and/or piping as needed to restore functionality and integrity. Perform a full system retest upon completion of repairs to confirm system integrity. Coordinate and schedule required inspection(s) as needed. AND Excavate and access damaged drain system by coordinating with Bats Foundation to tunnel approximately 10 from the exterior of the home to the garage area. Expose the broken 3 offset on the main drain line. Remove the damaged section and install new PVC fittings and piping to complete a proper repair with correct alignment and slope. Ensure sufficient exposure of piping to allow for a secure and code-compliant repair. Perform a full system retest upon completion of repairs to confirm system integrity. Coordinate and schedule required inspection(s) as needed.

FinalPlumbing PermitRepairMay 2026
View Details
2026-056746 PP
๐Ÿ”งPlumbing Outfitters LLC

Quick Actions

View on TDLR
TDLR ID: EABPRJB8801885

Property Owner

๐Ÿ‘ค
AANP
Contact: Registered by TDLR
View company profile
_ 901 SOUTH MOPAC EXPRESSWAY, AUSTIN, TX 78746
(512) 442-4262

Design Firm

๐Ÿ›๏ธ
STUDIO 8 ARCHITECTS
300 projects ยท $1.22B
View company profile
,
5124738989

Registered Accessibility Specialist

๐Ÿ“‹
ANDERSEN, ELAINE
RAS #1284
4214 MEDICAL PKWY STE 201, AUSTIN, TX 78756
(512) 415-6000

Explore Area

๐Ÿ™๏ธ
Austin
View city projects
๐Ÿ—บ๏ธ
Travis County
View county projects
๐Ÿ“ฎ
ZIP 78753
View zip code projects

Find Professionals

๐Ÿ”จ
Contractors in Austin
Licensed contractors directory
๐Ÿ—๏ธ
Builders in Austin
Home & commercial builders
๐Ÿ“
Architects in Austin
Architecture & design firms

Need a contractor for this project?

Browse verified general contractors active in Travis County

Find General Contractors in Travis

Get alerts for Travis

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists
Explore All Projects