Project intelligenceTDLR EABPRJB8803743New Construction
Funding type

This project is privately funded, on private land for private use.

NEW FUNERAL HOME FOR MISSION PARK

US HIGHWAY 281, San Antonio, TX, 78258

Target date passed (Jun 2019)Review Complete

NEW FUNERAL HOME FOR MISSION PARK is a new construction project at US HIGHWAY 281, San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jun 2019 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $4.5M.

Estimated project value
$4.5M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 7mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Oct 27, 2017582 days across supplied datesJun 1, 2019

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    5 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    577 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78258 (San Antonio)

One email per change. Unsubscribe in one click. Privacy.

NEW FUNERAL HOME FOR MISSION PARK is a New Construction project located at US HIGHWAY 281, San Antonio, TX 78258 in San Antonio, Texas. The project has an estimated value of $4.5M. ROBERT D. TIPS is the property owner and DESIGN ELEMENTS LLC is the design firm of record. The project was registered with TDLR on October 27, 2017.

Frequently Asked Questions

What is NEW FUNERAL HOME FOR MISSION PARK?

NEW FUNERAL HOME FOR MISSION PARK is a new construction project at US HIGHWAY 281 in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: A 42,000 SQ.FT. 3 STORY FUNERAL HOME.

Is NEW FUNERAL HOME FOR MISSION PARK open in San Antonio?

NEW FUNERAL HOME FOR MISSION PARK was scheduled to finish construction in Jun 2019 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is NEW FUNERAL HOME FOR MISSION PARK located?

NEW FUNERAL HOME FOR MISSION PARK is located at US HIGHWAY 281, San Antonio, TX, 78258, in Bexar County.

Who is the owner or developer of NEW FUNERAL HOME FOR MISSION PARK?

ROBERT D. TIPS is the property owner/developer of record for NEW FUNERAL HOME FOR MISSION PARK, per its TDLR project registration.

Who is the architect or design firm for NEW FUNERAL HOME FOR MISSION PARK?

DESIGN ELEMENTS LLC is the design firm of record for NEW FUNERAL HOME FOR MISSION PARK, according to its TDLR filing.

How much does NEW FUNERAL HOME FOR MISSION PARK cost and how big is it?

NEW FUNERAL HOME FOR MISSION PARK has an estimated construction value of $4.5M, based on its TDLR filing.

Scope of Work

A 42,000 SQ.FT. 3 STORY FUNERAL HOME.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

US HIGHWAY 281, San Antonio, TX, 78258

Location by street address

Watch all construction in 78258 (San Antonio)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in San Antonio?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.