UTSA DURANGO BLDG RENO PSYCH CENTER is a renovation/alteration project at 501 W. CESAR E. CHAVEZ. BLVD, San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2018). The project has an estimated value of $161K.
Project has been completed and closed
UTSA DURANGO BLDG RENO PSYCH CENTER is a Renovation/Alteration project located at 501 W. CESAR E. CHAVEZ. BLVD, San Antonio, TX 78207 in San Antonio, Texas. The project has an estimated value of $161K. UTSA is the property owner and CHESNEY MORALES is the design firm of record. The project was registered with TDLR on November 14, 2017.
UTSA DURANGO BLDG RENO PSYCH CENTER is a renovation/alteration project at 501 W. CESAR E. CHAVEZ. BLVD in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Second floor remodel to add 4 counseling rooms, one conference room, reception room & open study area.
Construction on UTSA DURANGO BLDG RENO PSYCH CENTER is complete โ TDLR records show the project passed its required accessibility inspection in Jun 2018. The building is finished and very likely open.
UTSA DURANGO BLDG RENO PSYCH CENTER is located at 501 W. CESAR E. CHAVEZ. BLVD, San Antonio, TX, 78207, in Bexar County.
UTSA is the property owner/developer of record for UTSA DURANGO BLDG RENO PSYCH CENTER, per its TDLR project registration.
CHESNEY MORALES is the design firm of record for UTSA DURANGO BLDG RENO PSYCH CENTER, according to its TDLR filing.
UTSA DURANGO BLDG RENO PSYCH CENTER has an estimated construction value of $161K, based on its TDLR filing.
Second floor remodel to add 4 counseling rooms, one conference room, reception room & open study area.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Nov 14, 2017
Review Complete
Inspection Complete
Closed
Jun 1, 2018