Funding type
This project is privately funded, on private land for private use.
SALT GEMS PHASE 1 in Nash, TX
SLANTON, Nash, TX, 75569
SALT GEMS PHASE 1 is a new construction project at SLANTON, Nash, in Bowie County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jun 2018 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $100K.
- Estimated project value
- $100K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- Not supplied
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- —
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 6 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
17 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
182 days after the preceding date shown.
Source: TDLR filing
View source record
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75569 (Nash)
One email per change. Unsubscribe in one click. Privacy.
SALT GEMS PHASE 1 is a New Construction project located at SLANTON, Nash, TX 75569 in Nash, Texas. The project has an estimated value of $100K. ZIA is the property owner and DESIGN BUILD CONSULTANTS is the design firm of record. The project was registered with TDLR on November 14, 2017.
Frequently Asked Questions
What is SALT GEMS PHASE 1?
SALT GEMS PHASE 1 is a new construction project at SLANTON in Nash, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New 2000sf building with parking lot
Is SALT GEMS PHASE 1 open in Nash?
SALT GEMS PHASE 1 was scheduled to finish construction in Jun 2018 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is SALT GEMS PHASE 1 located?
SALT GEMS PHASE 1 is located at SLANTON, Nash, TX, 75569, in Bowie County.
Who is the owner or developer of SALT GEMS PHASE 1?
ZIA is the property owner/developer of record for SALT GEMS PHASE 1, per its TDLR project registration.
Who is the architect or design firm for SALT GEMS PHASE 1?
DESIGN BUILD CONSULTANTS is the design firm of record for SALT GEMS PHASE 1, according to its TDLR filing.
How much does SALT GEMS PHASE 1 cost and how big is it?
SALT GEMS PHASE 1 has an estimated construction value of $100K, based on its TDLR filing.
Scope of Work
New 2000sf building with parking lot
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
SLANTON, Nash, TX, 75569
Related Projects
Same Design Firm
$10.7M totalWatch all construction in 75569 (Nash)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Nash?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.