Project intelligenceTDLR EABPRJB8804983New Construction
Funding type

This project is privately funded, on private land for private use.

FINISH OUT SUITE A100

3500 S FM620, Bee Cave, TX, 78738

Target date passed (Apr 2018)Project Registered

FINISH OUT SUITE A100 is a new construction project at 3500 S FM620, Bee Cave, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Apr 2018 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $200K.

Estimated project value
$200K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
4 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Nov 14, 2017138 days across supplied datesApr 1, 2018

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    17 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    121 days after the preceding date shown.

    Source: TDLR filing

    View source record

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78738 (Bee Cave)

One email per change. Unsubscribe in one click. Privacy.

FINISH OUT SUITE A100 is a New Construction project located at 3500 S FM620, Bee Cave, TX 78738 in Bee Cave, Texas. The project has an estimated value of $200K. ST. CROIX CAPITAL is the property owner and DRS ARCHITECTS is the design firm of record. The project was registered with TDLR on November 14, 2017.

Frequently Asked Questions

What is FINISH OUT SUITE A100?

FINISH OUT SUITE A100 is a new construction project at 3500 S FM620 in Bee Cave, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Shell Interior Finish Out of a pharmacy in an existing retail shell building.

Is FINISH OUT SUITE A100 open in Bee Cave?

FINISH OUT SUITE A100 was scheduled to finish construction in Apr 2018 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is FINISH OUT SUITE A100 located?

FINISH OUT SUITE A100 is located at 3500 S FM620, Bee Cave, TX, 78738, in Travis County.

Who is the owner or developer of FINISH OUT SUITE A100?

ST. CROIX CAPITAL is the property owner/developer of record for FINISH OUT SUITE A100, per its TDLR project registration.

Who is the architect or design firm for FINISH OUT SUITE A100?

DRS ARCHITECTS is the design firm of record for FINISH OUT SUITE A100, according to its TDLR filing.

How much does FINISH OUT SUITE A100 cost and how big is it?

FINISH OUT SUITE A100 has an estimated construction value of $200K, based on its TDLR filing.

Scope of Work

Shell Interior Finish Out of a pharmacy in an existing retail shell building.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

3500 S FM620, Bee Cave, TX, 78738

Location by street address

Related City Permits

Building permits found at or near this location

3500 S SH 130 SVRD SB BLDG 1

Provide all labor and materials for the installation of an irrigation system to be installed on meters providing reclaimed water. All components provided (heads valve boxes PVC Pipe and Drip) to be purple in color denoting reclaimed water. REF: 2026-018608 W

ActivePlumbing PermitIrrigationSep 2026
View Details
2026-119064 PP
3500 S SH 130 SVRD SB BLDG 3

New Construction Office Warehouse Building 3

ActiveBuilding PermitShellSep 2026
$1
View Details
2024-163868 BP
Raymond Construction Co., Inc
3500 S SH 130 SVRD SB BLDG 4

New Construction Office Warehouse Building 4

ActiveBuilding PermitShellSep 2026
$1
View Details
2024-163869 BP
Raymond Construction Co., Inc
3500 E PARMER LN UNIT 3210

Interior finish out for a sports bar and grill. 3000 sqft.

ActiveMechanical PermitRemodelSep 2026
View Details
2026-101561 MP
ZuzmaCooling & Heating LLC
3500 S SH 130 SVRD SB BLDG 2

Installation of 540kW AC Roof Mounted Auxiliary Power System The service is for BLDG 2 UNIT DG

FinalElectrical PermitAuxiliary PowerAug 2026
View Details
2025-156375 EP
Spear C&I, LLC

Watch all construction in 78738 (Bee Cave)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Bee Cave?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.