ATX FULFILLMENT
ATX FULFILLMENT is a new construction project at 4400 SUPPLY COURT DRIVE SUITE 100, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Nov 2018). The project has an estimated value of $148K.
๐Project Metrics
TDLR #EABPRJB8805100Project Closed
Project has been completed and closed
ATX FULFILLMENT is a New Construction project located at 4400 SUPPLY COURT DRIVE SUITE 100, Austin, TX 78744 in Austin, Texas. The project has an estimated value of $148K. JACK LANDAU is the property owner and KAMPFE DE STIJL is the design firm of record. The project was registered with TDLR on November 15, 2017.
โFrequently Asked Questions
What is ATX FULFILLMENT?
ATX FULFILLMENT is a new construction project at 4400 SUPPLY COURT DRIVE SUITE 100 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: FIRST TIME FINISH OUT. OFFICE/WAREHOUSE
Is ATX FULFILLMENT open in Austin?
Construction on ATX FULFILLMENT is complete โ TDLR records show the project passed its required accessibility inspection in Nov 2018. The building is finished and very likely open.
Where is ATX FULFILLMENT located?
ATX FULFILLMENT is located at 4400 SUPPLY COURT DRIVE SUITE 100, Austin, TX, 78744, in Travis County.
Who is the owner or developer of ATX FULFILLMENT?
JACK LANDAU is the property owner/developer of record for ATX FULFILLMENT, per its TDLR project registration.
Who is the architect or design firm for ATX FULFILLMENT?
KAMPFE DE STIJL is the design firm of record for ATX FULFILLMENT, according to its TDLR filing.
How much does ATX FULFILLMENT cost and how big is it?
ATX FULFILLMENT has an estimated construction value of $148K, based on its TDLR filing.
๐Scope of Work
FIRST TIME FINISH OUT. OFFICE/WAREHOUSE
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Nov 15, 2017
Review Complete
Inspection Complete
Closed
Nov 30, 2018
๐Related Projects
๐คSame Owner
$1.0M total๐๏ธSame Design Firm
$100.6M total๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 4 ton two stage horizontal gas system
disassemble old service riser and meter can and install a new 200 amp main panel in Austin energy rated meter can. Service riser will be located on the side of the garage with a roof penetration. Roof penetration will be sealed with a flashing. New point of attachment will be supplying over 12 feet above grade to passcode. All electrical work will be permitted inspected and installed per NEC and jurisdictional standards.
excavate 6 tunnel to repair main drain line under house
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 2.5T horizontal Heat pump system (APT 23)
Full residential electrical service rebuild. New 200 amp lever lock meter base. New 200 amp main breaker panel New grounding as needed. Will require temporary disconnect from Austin Energy
Property Owner
Design Firm
Registered Accessibility Specialist
Travis County Economy
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Travis County
Find General Contractors in Travis