Project intelligenceTDLR EABPRJB8805159Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

TVCC TERRELL HOSPITAL REPURPOSING

1551 Highway 34 South, Terrell, TX, 75160

Construction complete · Jun 2020Project Closed

TVCC TERRELL HOSPITAL REPURPOSING is a renovation/alteration project at 1551 Highway 34 South, Terrell, in Kaufman County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2020). The project has an estimated value of $11.6M across about 89,000 sq ft.

Estimated project value
$11.6M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
89,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$130/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2y 4mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Nov 16, 2017928 days across supplied datesJun 1, 2020

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    77 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    851 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75160 (Terrell)

One email per change. Unsubscribe in one click. Privacy.

TVCC TERRELL HOSPITAL REPURPOSING is a Renovation/Alteration project located at 1551 Highway 34 South, Terrell, TX 75160 in Terrell, Texas. The project has an estimated value of $11.6M covering 89,000 sq ft. Trinity Valley Community College is the property owner and RANDALL SCOTT ARCHITECTS is the design firm of record. The project was registered with TDLR on November 16, 2017.

Frequently Asked Questions

What is TVCC TERRELL HOSPITAL REPURPOSING?

TVCC TERRELL HOSPITAL REPURPOSING is a renovation/alteration project at 1551 Highway 34 South in Terrell, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 4000 SF Addition to existing building + West facade addition. 54,000 SF existing interior renovation.

Is TVCC TERRELL HOSPITAL REPURPOSING open in Terrell?

Construction on TVCC TERRELL HOSPITAL REPURPOSING is complete — TDLR records show the project passed its required accessibility inspection in Jun 2020. The building is finished and very likely open.

Where is TVCC TERRELL HOSPITAL REPURPOSING located?

TVCC TERRELL HOSPITAL REPURPOSING is located at 1551 Highway 34 South, Terrell, TX, 75160, in Kaufman County.

Who is the owner or developer of TVCC TERRELL HOSPITAL REPURPOSING?

Trinity Valley Community College is the property owner/developer of record for TVCC TERRELL HOSPITAL REPURPOSING, per its TDLR project registration.

Who is the architect or design firm for TVCC TERRELL HOSPITAL REPURPOSING?

RANDALL SCOTT ARCHITECTS is the design firm of record for TVCC TERRELL HOSPITAL REPURPOSING, according to its TDLR filing.

How much does TVCC TERRELL HOSPITAL REPURPOSING cost and how big is it?

TVCC TERRELL HOSPITAL REPURPOSING has an estimated construction value of $11.6M and approximately 89,000 square feet (about $130/sqft), based on its TDLR filing.

Scope of Work

4000 SF Addition to existing building + West facade addition. 54,000 SF existing interior renovation.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

1551 Highway 34 South, Terrell, TX, 75160

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75160 (Terrell)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.