Funding type
This project is privately funded, on private land for private use.
ST. LUKE'S UNITED METHODIST CHURCH
3471 WESTHEIMER RD, Houston, TX, 77027
ST. LUKE'S UNITED METHODIST CHURCH is a renovation/alteration project at 3471 WESTHEIMER RD, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Aug 2018 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $1.2M.
- Estimated project value
- $1.2M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- Not supplied
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- —
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 6 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
65 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
181 days after the preceding date shown.
Source: TDLR filing
View source record
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77027 (Houston)
One email per change. Unsubscribe in one click. Privacy.
ST. LUKE'S UNITED METHODIST CHURCH is a Renovation/Alteration project located at 3471 WESTHEIMER RD, Houston, TX 77027 in Houston, Texas. The project has an estimated value of $1.2M. ST. LUKE'S UNITED METHODIST CHURCH is the property owner and B&D COMMUNITY DESIGN STUDIO LLC is the design firm of record. The project was registered with TDLR on November 28, 2017.
Frequently Asked Questions
What is ST. LUKE'S UNITED METHODIST CHURCH?
ST. LUKE'S UNITED METHODIST CHURCH is a renovation/alteration project at 3471 WESTHEIMER RD in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior Renovation of finishes to improve acoustics andlighting in room including expanding of the existing pl
Is ST. LUKE'S UNITED METHODIST CHURCH open in Houston?
ST. LUKE'S UNITED METHODIST CHURCH was scheduled to finish construction in Aug 2018 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is ST. LUKE'S UNITED METHODIST CHURCH located?
ST. LUKE'S UNITED METHODIST CHURCH is located at 3471 WESTHEIMER RD, Houston, TX, 77027, in Harris County.
Who is the owner or developer of ST. LUKE'S UNITED METHODIST CHURCH?
ST. LUKE'S UNITED METHODIST CHURCH is the property owner/developer of record for ST. LUKE'S UNITED METHODIST CHURCH, per its TDLR project registration.
Who is the architect or design firm for ST. LUKE'S UNITED METHODIST CHURCH?
B&D COMMUNITY DESIGN STUDIO LLC is the design firm of record for ST. LUKE'S UNITED METHODIST CHURCH, according to its TDLR filing.
How much does ST. LUKE'S UNITED METHODIST CHURCH cost and how big is it?
ST. LUKE'S UNITED METHODIST CHURCH has an estimated construction value of $1.2M, based on its TDLR filing.
Scope of Work
Interior Renovation of finishes to improve acoustics andlighting in room including expanding of the existing pl
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
3471 WESTHEIMER RD, Houston, TX, 77027
Related Projects
Same Owner
$27.8M totalWatch all construction in 77027 (Houston)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Houston?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.