Project intelligenceTDLR EABPRJB8806428New Construction
Funding type

This project is privately funded, on private land for private use.

NEW FIRESTONE STORE in Bartonville, TX

NEAR FM 407 & MCMAKIN ROAD, Bartonville, TX, 76226

Construction complete · Sep 2018Project Closed

NEW FIRESTONE STORE is a new construction project at NEAR FM 407 & MCMAKIN ROAD, Bartonville, in Denton County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2018). The project has an estimated value of $1.1M.

Estimated project value
$1.1M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
7 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Dec 8, 2017267 days across supplied datesSep 1, 2018

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    55 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    212 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76226 (Bartonville)

One email per change. Unsubscribe in one click. Privacy.

NEW FIRESTONE STORE is a New Construction project located at NEAR FM 407 & MCMAKIN ROAD, Bartonville, TX 76226 in Bartonville, Texas. The project has an estimated value of $1.1M. BRIDGESTONE RETAIL OPERATIONS LLC is the property owner and SGA DESIGN GROUP P.C. is the design firm of record. The project was registered with TDLR on December 8, 2017.

Frequently Asked Questions

What is NEW FIRESTONE STORE?

NEW FIRESTONE STORE is a new construction project at NEAR FM 407 & MCMAKIN ROAD in Bartonville, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New Metal Building, exterior stone/EIFS and site work for Firestone Complete AutoCare Facility.

Is NEW FIRESTONE STORE open in Bartonville?

Construction on NEW FIRESTONE STORE is complete — TDLR records show the project passed its required accessibility inspection in Sep 2018. The building is finished and very likely open.

Where is NEW FIRESTONE STORE located?

NEW FIRESTONE STORE is located at NEAR FM 407 & MCMAKIN ROAD, Bartonville, TX, 76226, in Denton County.

Who is the owner or developer of NEW FIRESTONE STORE?

BRIDGESTONE RETAIL OPERATIONS LLC is the property owner/developer of record for NEW FIRESTONE STORE, per its TDLR project registration.

Who is the architect or design firm for NEW FIRESTONE STORE?

SGA DESIGN GROUP P.C. is the design firm of record for NEW FIRESTONE STORE, according to its TDLR filing.

How much does NEW FIRESTONE STORE cost and how big is it?

NEW FIRESTONE STORE has an estimated construction value of $1.1M, based on its TDLR filing.

Scope of Work

New Metal Building, exterior stone/EIFS and site work for Firestone Complete AutoCare Facility.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

NEAR FM 407 & MCMAKIN ROAD, Bartonville, TX, 76226

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 76226 (Bartonville)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Bartonville?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.