Project intelligenceTDLR EABPRJB8806637New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

HARRIS COUNTY WCID 145 - TRAILS PHASE 3

PARK FALLS AND ROYAL GARDENS, Cypress, TX, 77095

Construction complete · Jul 2018Project Closed

HARRIS COUNTY WCID 145 - TRAILS PHASE 3 is a new construction project at PARK FALLS AND ROYAL GARDENS, Cypress, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jul 2018). The project has an estimated value of $290K.

Estimated project value
$290K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
7 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Dec 12, 2017230 days across supplied datesJul 30, 2018

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    20 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    210 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77095 (Cypress)

One email per change. Unsubscribe in one click. Privacy.

HARRIS COUNTY WCID 145 - TRAILS PHASE 3 is a New Construction project located at PARK FALLS AND ROYAL GARDENS, Cypress, TX 77095 in Cypress, Texas. The project has an estimated value of $290K. HARRIS COUNTY WCID 145 is the property owner and KGA/DEFOREST DESIGN is the design firm of record. The project was registered with TDLR on December 12, 2017.

Frequently Asked Questions

What is HARRIS COUNTY WCID 145 - TRAILS PHASE 3?

HARRIS COUNTY WCID 145 - TRAILS PHASE 3 is a new construction project at PARK FALLS AND ROYAL GARDENS in Cypress, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Concrete sidewalk project around end of drainage channelwest of Park Falls Drive between Rainbow Lake Rd. and R

Is HARRIS COUNTY WCID 145 - TRAILS PHASE 3 open in Cypress?

Construction on HARRIS COUNTY WCID 145 - TRAILS PHASE 3 is complete — TDLR records show the project passed its required accessibility inspection in Jul 2018. The building is finished and very likely open.

Where is HARRIS COUNTY WCID 145 - TRAILS PHASE 3 located?

HARRIS COUNTY WCID 145 - TRAILS PHASE 3 is located at PARK FALLS AND ROYAL GARDENS, Cypress, TX, 77095, in Harris County.

Who is the owner or developer of HARRIS COUNTY WCID 145 - TRAILS PHASE 3?

HARRIS COUNTY WCID 145 is the property owner/developer of record for HARRIS COUNTY WCID 145 - TRAILS PHASE 3, per its TDLR project registration.

Who is the architect or design firm for HARRIS COUNTY WCID 145 - TRAILS PHASE 3?

KGA/DEFOREST DESIGN is the design firm of record for HARRIS COUNTY WCID 145 - TRAILS PHASE 3, according to its TDLR filing.

How much does HARRIS COUNTY WCID 145 - TRAILS PHASE 3 cost and how big is it?

HARRIS COUNTY WCID 145 - TRAILS PHASE 3 has an estimated construction value of $290K, based on its TDLR filing.

Scope of Work

Concrete sidewalk project around end of drainage channelwest of Park Falls Drive between Rainbow Lake Rd. and R

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

PARK FALLS AND ROYAL GARDENS, Cypress, TX, 77095

Location by street address

Watch all construction in 77095 (Cypress)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.