TEXAS REGIONAL BANK
TEXAS REGIONAL BANK is a new construction project at 310 WONDER WORLD DRIVE, San Marcos, in Hays County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2018). The project has an estimated value of $2.9M.
๐Project Metrics
TDLR #EABPRJB8807300Project Closed
Project has been completed and closed
TEXAS REGIONAL BANK is a New Construction project located at 310 WONDER WORLD DRIVE, San Marcos, TX 78666 in San Marcos, Texas. The project has an estimated value of $2.9M. TEXAS REGIONAL BANK is the property owner and JACKSON MCELHANEY ARCHITECTS is the design firm of record. The project was registered with TDLR on December 21, 2017.
โFrequently Asked Questions
What is TEXAS REGIONAL BANK?
TEXAS REGIONAL BANK is a new construction project at 310 WONDER WORLD DRIVE in San Marcos, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New bank building and drive thru
Is TEXAS REGIONAL BANK open in San Marcos?
Construction on TEXAS REGIONAL BANK is complete โ TDLR records show the project passed its required accessibility inspection in Aug 2018. The building is finished and very likely open.
Where is TEXAS REGIONAL BANK located?
TEXAS REGIONAL BANK is located at 310 WONDER WORLD DRIVE, San Marcos, TX, 78666, in Hays County.
Who is the owner or developer of TEXAS REGIONAL BANK?
TEXAS REGIONAL BANK is the property owner/developer of record for TEXAS REGIONAL BANK, per its TDLR project registration.
Who is the architect or design firm for TEXAS REGIONAL BANK?
JACKSON MCELHANEY ARCHITECTS is the design firm of record for TEXAS REGIONAL BANK, according to its TDLR filing.
How much does TEXAS REGIONAL BANK cost and how big is it?
TEXAS REGIONAL BANK has an estimated construction value of $2.9M, based on its TDLR filing.
๐Scope of Work
New bank building and drive thru
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Dec 21, 2017
Review Complete
Inspection Complete
Closed
Aug 1, 2018
๐Related Projects
๐คSame Owner
$44.9M total๐๏ธSame Design Firm
$158.3M total๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system without duct work for Unit 1320
Replace main sewer line outside to tap.
Secondary Mechanical Contractor* Installing walk-in cooler and refrigeration systems only
gas pipe addition/replacement: We are redoing portion of gas line that was black iron and in ground and redoing it with black iron with the same sizing and placing it 3 inches above grade.
overhead temp for 2026-018771 EP
Property Owner
Design Firm
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Hays County
Find General Contractors in Hays