704 WONSLEY
704 WONSLEY is a renovation/alteration project at 704 EAST WONSLEY DRIVE, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2018). The project has an estimated value of $120K.
๐Project Metrics
TDLR #EABPRJB8807871Inspection Complete
Final inspection completed, awaiting project closure
704 WONSLEY is a Renovation/Alteration project located at 704 EAST WONSLEY DRIVE, Austin, TX 78753 in Austin, Texas. The project has an estimated value of $120K. DR. KEITH LAMY is the property owner and CRAIG NASSO ARCHITECT is the design firm of record. The project was registered with TDLR on January 5, 2018.
โFrequently Asked Questions
What is 704 WONSLEY?
704 WONSLEY is a renovation/alteration project at 704 EAST WONSLEY DRIVE in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior remodel, ADA ramp
Is 704 WONSLEY open in Austin?
Construction on 704 WONSLEY is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2018. The building is finished and very likely open.
Where is 704 WONSLEY located?
704 WONSLEY is located at 704 EAST WONSLEY DRIVE, Austin, TX, 78753, in Travis County.
Who is the owner or developer of 704 WONSLEY?
DR. KEITH LAMY is the property owner/developer of record for 704 WONSLEY, per its TDLR project registration.
Who is the architect or design firm for 704 WONSLEY?
CRAIG NASSO ARCHITECT is the design firm of record for 704 WONSLEY, according to its TDLR filing.
How much does 704 WONSLEY cost and how big is it?
704 WONSLEY has an estimated construction value of $120K, based on its TDLR filing.
๐Scope of Work
Interior remodel, ADA ramp
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jan 5, 2018
Review Complete
Inspection Complete
Apr 1, 2018
Closed
๐Related Projects
๐๏ธSame Design Firm
$2.5M total๐Related City Permits
Building permits found at or near this location
Rewire 1920s house to current 2023 NEC - existing service is to remain 30sqft of sheerock removal only
Exterior run circuit from main service to tankless water heater
irrigation for lawn
Replace existing roof structure due to fire damage plus minor exterior repairs as drawn and noted.
Total demo of sfr 3735 sqft circa 1962 wastewater lines are connected to septic that will be abandoned with the demolition