700 LAKESIDE #300 MAKE READY
700 LAKESIDE #300 MAKE READY is a renovation/alteration project at 700 LAKESIDE PKWY #300, Flower Mound, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $180K.
๐Project Metrics
TDLR #EABPRJB8807917Project Registered
Project has been registered with TDLR and is in pre-construction phase
700 LAKESIDE #300 MAKE READY is a Renovation/Alteration project located at 700 LAKESIDE PKWY #300, Flower Mound, TX 75028 in Flower Mound, Texas. The project has an estimated value of $180K. CBRE is the property owner. The project was registered with TDLR on January 5, 2018.
โFrequently Asked Questions
What is 700 LAKESIDE #300 MAKE READY?
700 LAKESIDE #300 MAKE READY is a renovation/alteration project at 700 LAKESIDE PKWY #300 in Flower Mound, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior office build out within first-generation industrial warehouse vacancy space.
Is 700 LAKESIDE #300 MAKE READY open in Flower Mound?
700 LAKESIDE #300 MAKE READY is currently under construction in Flower Mound, TX. Its current TDLR status is "Project Registered".
Where is 700 LAKESIDE #300 MAKE READY located?
700 LAKESIDE #300 MAKE READY is located at 700 LAKESIDE PKWY #300, Flower Mound, TX, 75028, in Collin County.
Who is the owner or developer of 700 LAKESIDE #300 MAKE READY?
CBRE is the property owner/developer of record for 700 LAKESIDE #300 MAKE READY, per its TDLR project registration.
How much does 700 LAKESIDE #300 MAKE READY cost and how big is it?
700 LAKESIDE #300 MAKE READY has an estimated construction value of $180K, based on its TDLR filing.
๐Scope of Work
Interior office build out within first-generation industrial warehouse vacancy space.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jan 5, 2018
Review Complete
Inspection Complete
Closed