Project intelligenceTDLR EABPRJB8808189New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

ELDORADO SIDEWALK IMPROVEMENTS

6 SOUTH COTTONWOOD ST PO Box 713, Eldorado, TX, 76936

Construction complete · Dec 2018Project Closed

ELDORADO SIDEWALK IMPROVEMENTS is a new construction project at 6 SOUTH COTTONWOOD ST PO Box 713, Eldorado, in Schleicher County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2018). The project has an estimated value of $560K.

Estimated project value
$560K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
6 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jan 10, 2018325 days across supplied datesDec 1, 2018

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    142 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    183 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76936 (Eldorado)

One email per change. Unsubscribe in one click. Privacy.

ELDORADO SIDEWALK IMPROVEMENTS is a New Construction project located at 6 SOUTH COTTONWOOD ST PO Box 713, Eldorado, TX 76936 in Eldorado, Texas. The project has an estimated value of $560K. CITY OF ELDORADO is the property owner and KSA ENGINEERS is the design firm of record. The project was registered with TDLR on January 10, 2018.

Frequently Asked Questions

What is ELDORADO SIDEWALK IMPROVEMENTS?

ELDORADO SIDEWALK IMPROVEMENTS is a new construction project at 6 SOUTH COTTONWOOD ST PO Box 713 in Eldorado, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construct a 5’ concrete sidewalk from Eldorado High School and Elementary School to the Schleicher County Park a

Is ELDORADO SIDEWALK IMPROVEMENTS open in Eldorado?

Construction on ELDORADO SIDEWALK IMPROVEMENTS is complete — TDLR records show the project passed its required accessibility inspection in Dec 2018. The building is finished and very likely open.

Where is ELDORADO SIDEWALK IMPROVEMENTS located?

ELDORADO SIDEWALK IMPROVEMENTS is located at 6 SOUTH COTTONWOOD ST PO Box 713, Eldorado, TX, 76936, in Schleicher County.

Who is the owner or developer of ELDORADO SIDEWALK IMPROVEMENTS?

CITY OF ELDORADO is the property owner/developer of record for ELDORADO SIDEWALK IMPROVEMENTS, per its TDLR project registration.

Who is the architect or design firm for ELDORADO SIDEWALK IMPROVEMENTS?

KSA ENGINEERS is the design firm of record for ELDORADO SIDEWALK IMPROVEMENTS, according to its TDLR filing.

How much does ELDORADO SIDEWALK IMPROVEMENTS cost and how big is it?

ELDORADO SIDEWALK IMPROVEMENTS has an estimated construction value of $560K, based on its TDLR filing.

Scope of Work

Construct a 5’ concrete sidewalk from Eldorado High School and Elementary School to the Schleicher County Park a

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

6 SOUTH COTTONWOOD ST PO Box 713, Eldorado, TX, 76936

Loading location map…
30.85909, -100.59919

Watch all construction in 76936 (Eldorado)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Eldorado?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.