Project intelligenceTDLR EABPRJB8809956Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

MCD EOTF (42-2760) SHADOW CREEK in Pearland, TX

2815 BUSINESS CENTER DRIVE, Pearland, TX, 77584

Construction complete · Oct 2018Inspection Complete

MCD EOTF (42-2760) SHADOW CREEK is a renovation/alteration project at 2815 BUSINESS CENTER DRIVE, Pearland, in Brazoria County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2018). The project has an estimated value of $100K.

Estimated project value
$100K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
4 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Feb 6, 2018237 days across supplied datesOct 1, 2018

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    115 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    122 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77584 (Pearland)

One email per change. Unsubscribe in one click. Privacy.

MCD EOTF (42-2760) SHADOW CREEK is a Renovation/Alteration project located at 2815 BUSINESS CENTER DRIVE, Pearland, TX 77584 in Pearland, Texas. The project has an estimated value of $100K. MCDONALD'S USA LLC is the property owner and CASTLES DESIGN GROUP P.C. is the design firm of record. The project was registered with TDLR on February 6, 2018.

Frequently Asked Questions

What is MCD EOTF (42-2760) SHADOW CREEK?

MCD EOTF (42-2760) SHADOW CREEK is a renovation/alteration project at 2815 BUSINESS CENTER DRIVE in Pearland, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: An interior lobby remodel of an existing McDonald's Restaurant.

Is MCD EOTF (42-2760) SHADOW CREEK open in Pearland?

Construction on MCD EOTF (42-2760) SHADOW CREEK is complete — TDLR records show the project passed its required accessibility inspection in Oct 2018. The building is finished and very likely open.

Where is MCD EOTF (42-2760) SHADOW CREEK located?

MCD EOTF (42-2760) SHADOW CREEK is located at 2815 BUSINESS CENTER DRIVE, Pearland, TX, 77584, in Brazoria County.

Who is the owner or developer of MCD EOTF (42-2760) SHADOW CREEK?

MCDONALD'S USA LLC is the property owner/developer of record for MCD EOTF (42-2760) SHADOW CREEK, per its TDLR project registration.

Who is the architect or design firm for MCD EOTF (42-2760) SHADOW CREEK?

CASTLES DESIGN GROUP P.C. is the design firm of record for MCD EOTF (42-2760) SHADOW CREEK, according to its TDLR filing.

How much does MCD EOTF (42-2760) SHADOW CREEK cost and how big is it?

MCD EOTF (42-2760) SHADOW CREEK has an estimated construction value of $100K, based on its TDLR filing.

Scope of Work

An interior lobby remodel of an existing McDonald's Restaurant.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

2815 BUSINESS CENTER DRIVE, Pearland, TX, 77584

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 77584 (Pearland)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Pearland?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.