SPEC SUITE
SPEC SUITE is a renovation/alteration project at 12554 TEXAS 3 Suite B270, Webster, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $128K.
๐Project Metrics
TDLR #EABPRJB8811063Project Registered
Project has been registered with TDLR and is in pre-construction phase
SPEC SUITE is a Renovation/Alteration project located at 12554 TEXAS 3 Suite B270, Webster, TX 77598 in Webster, Texas. The project has an estimated value of $128K. COLUMBIA TEXAS GALVESTON INDUSTRIAL LLC is the property owner and INVENTURE DESIGN GROUP is the design firm of record. The project was registered with TDLR on February 22, 2018.
โFrequently Asked Questions
What is SPEC SUITE?
SPEC SUITE is a renovation/alteration project at 12554 TEXAS 3 Suite B270 in Webster, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of existing Industrial build out
Is SPEC SUITE open in Webster?
SPEC SUITE is currently under construction in Webster, TX. Its current TDLR status is "Project Registered".
Where is SPEC SUITE located?
SPEC SUITE is located at 12554 TEXAS 3 Suite B270, Webster, TX, 77598, in Harris County.
Who is the owner or developer of SPEC SUITE?
COLUMBIA TEXAS GALVESTON INDUSTRIAL LLC is the property owner/developer of record for SPEC SUITE, per its TDLR project registration.
Who is the architect or design firm for SPEC SUITE?
INVENTURE DESIGN GROUP is the design firm of record for SPEC SUITE, according to its TDLR filing.
How much does SPEC SUITE cost and how big is it?
SPEC SUITE has an estimated construction value of $128K, based on its TDLR filing.
๐Scope of Work
Renovation of existing Industrial build out
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Feb 22, 2018
Review Complete
Inspection Complete
Closed