WHITE BOX
WHITE BOX is a renovation/alteration project at 1919 NW LOOP 410, SUITE 100 suite 202, San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2018). The project has an estimated value of $171K.
๐Project Metrics
TDLR #EABPRJB8811291Inspection Complete
Final inspection completed, awaiting project closure
WHITE BOX is a Renovation/Alteration project located at 1919 NW LOOP 410, SUITE 100 suite 202, San Antonio, TX 78213 in San Antonio, Texas. The project has an estimated value of $171K. LINCOLN HARRIS CSG is the property owner and VILLA PARK ARCHITECTURE PLLC is the design firm of record. The project was registered with TDLR on February 26, 2018.
โFrequently Asked Questions
What is WHITE BOX?
WHITE BOX is a renovation/alteration project at 1919 NW LOOP 410, SUITE 100 suite 202 in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: interior renovation to existing office suite
Is WHITE BOX open in San Antonio?
Construction on WHITE BOX is complete โ TDLR records show the project passed its required accessibility inspection in May 2018. The building is finished and very likely open.
Where is WHITE BOX located?
WHITE BOX is located at 1919 NW LOOP 410, SUITE 100 suite 202, San Antonio, TX, 78213, in Bexar County.
Who is the owner or developer of WHITE BOX?
LINCOLN HARRIS CSG is the property owner/developer of record for WHITE BOX, per its TDLR project registration.
Who is the architect or design firm for WHITE BOX?
VILLA PARK ARCHITECTURE PLLC is the design firm of record for WHITE BOX, according to its TDLR filing.
How much does WHITE BOX cost and how big is it?
WHITE BOX has an estimated construction value of $171K, based on its TDLR filing.
๐Scope of Work
interior renovation to existing office suite
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Feb 26, 2018
Review Complete
Inspection Complete
May 1, 2018
Closed