DOLLAR TREE 57 LOOP 150
DOLLAR TREE 57 LOOP 150 is a renovation/alteration project at 57 WEST LOOP 150, Bastrop, in Bastrop County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jul 2018). The project has an estimated value of $119K.
๐Project Metrics
TDLR #EABPRJB8812443Project Closed
Project has been completed and closed
DOLLAR TREE 57 LOOP 150 is a Renovation/Alteration project located at 57 WEST LOOP 150, Bastrop, TX 78602 in Bastrop, Texas. The project has an estimated value of $119K. HOWARD SCHAIN is the property owner and CASCO DIVERSIFIED CORPORATION is the design firm of record. The project was registered with TDLR on March 13, 2018.
โFrequently Asked Questions
What is DOLLAR TREE 57 LOOP 150?
DOLLAR TREE 57 LOOP 150 is a renovation/alteration project at 57 WEST LOOP 150 in Bastrop, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Tenant TI
Is DOLLAR TREE 57 LOOP 150 open in Bastrop?
Construction on DOLLAR TREE 57 LOOP 150 is complete โ TDLR records show the project passed its required accessibility inspection in Jul 2018. The building is finished and very likely open.
Where is DOLLAR TREE 57 LOOP 150 located?
DOLLAR TREE 57 LOOP 150 is located at 57 WEST LOOP 150, Bastrop, TX, 78602, in Bastrop County.
Who is the owner or developer of DOLLAR TREE 57 LOOP 150?
HOWARD SCHAIN is the property owner/developer of record for DOLLAR TREE 57 LOOP 150, per its TDLR project registration.
Who is the architect or design firm for DOLLAR TREE 57 LOOP 150?
CASCO DIVERSIFIED CORPORATION is the design firm of record for DOLLAR TREE 57 LOOP 150, according to its TDLR filing.
How much does DOLLAR TREE 57 LOOP 150 cost and how big is it?
DOLLAR TREE 57 LOOP 150 has an estimated construction value of $119K, based on its TDLR filing.
๐Scope of Work
Tenant TI
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Mar 13, 2018
Review Complete
Inspection Complete
Closed
Jul 1, 2018
๐Related Projects
๐คSame Owner
$469K total๐Related City Permits
Building permits found at or near this location
New construction of a 2-Story Single Family Res. [4 bed 3.5 bath] with Attached carport
Replacement of complete existing central heat and air system with or without duct work
Replaced sections of clay piping on the exterior of the structure. Repairs were made using pvc.
New construction of 2 story SFR with 4 beds 2.5 baths with 2 car garage and covered patio
This permit is needed to provide service to a temporary pole for construction of a new home. The permit # for this project is 2026-026951 BP