Design review complete, construction may proceed
EANES ELEMENTARY COOLER REPLACEMENT is a Renovation/Alteration project located at 4101 BEE CAVE RD, West Lake Hills, TX 78746 in West Lake Hills, Texas. The project has an estimated value of $155K. EANES INDEPENDENT SCHOOL DISTRICT is the property owner and FIELDS & ASSOCIATES is the design firm of record. The project was registered with TDLR on March 13, 2018.
Remove an existing cooler and foundation and construct anew foundation, truck dock and cooler. Cover the new c
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Mar 13, 2018
Review Complete
Mar 13, 2018
Inspection Complete
Closed
Building permits found at or near this location
Renovation of 1180 sq ft of an Existing Medical Office Building to Support Equipment Change Out. Select Demo of Non-load bearing Walls Ceilings and Finishes and Modifications to MEPS to Support New Equipment Layout for Suite 100
Renovation of 1180 sq ft of an Existing Medical Office Building to Support Equipment Change Out. Select Demo of Non-load bearing Walls Ceilings and Finishes and Modifications to MEPS to Support New Equipment Layout for Suite 100
Renovation of 1180 sq ft of an Existing Medical Office Building to Support Equipment Change Out. Select Demo of Non-load bearing Walls Ceilings and Finishes and Modifications to MEPS to Support New Equipment Layout for Suite 100
Renovation of 1180 sq ft of an Existing Medical Office Building to Support Equipment Change Out. Select Demo of Non-load bearing Walls Ceilings and Finishes and Modifications to MEPS to Support New Equipment Layout for Suite 100
Installation of a Point of Connection (POC) to an existing irrigation system. Work will include connecting to the domestic water supply installation of a code-compliant backflow prevention assembly isolation valve(s) and all necessary fittings to establish a dedicated irrigation connection. Installation will comply with City of Austin plumbing and irrigation requirements. System will be tested and inspected as required prior to final approval.