Project intelligenceTDLR EABPRJB8813060New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

2017-2021 PARKS CIP PHASE 1 in Copperas Cove, TX

MULTIPLE LOCATIONS, Copperas Cove, TX, 76522

Construction complete · Feb 2019Project Closed

2017-2021 PARKS CIP PHASE 1 is a new construction project at MULTIPLE LOCATIONS, Copperas Cove, in Bell County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Feb 2019). The project has an estimated value of $1.2M.

Estimated project value
$1.2M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1 year
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Feb 1, 2018365 days across supplied datesFeb 1, 2019

4 timeline dates shown.

  1. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Source: TDLR filing

    View source record
  2. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    49 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    316 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76522 (Copperas Cove)

One email per change. Unsubscribe in one click. Privacy.

2017-2021 PARKS CIP PHASE 1 is a New Construction project located at MULTIPLE LOCATIONS, Copperas Cove, TX 76522 in Copperas Cove, Texas. The project has an estimated value of $1.2M. CITY OF COPPERAS COVE is the property owner and BSP ENGINEERS INC. is the design firm of record. The project was registered with TDLR on March 22, 2018.

Frequently Asked Questions

What is 2017-2021 PARKS CIP PHASE 1?

2017-2021 PARKS CIP PHASE 1 is a new construction project at MULTIPLE LOCATIONS in Copperas Cove, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: This project consists of the construction of improvements to eight (8) parks throughout the city. (City, Rhode,

Is 2017-2021 PARKS CIP PHASE 1 open in Copperas Cove?

Construction on 2017-2021 PARKS CIP PHASE 1 is complete — TDLR records show the project passed its required accessibility inspection in Feb 2019. The building is finished and very likely open.

Where is 2017-2021 PARKS CIP PHASE 1 located?

2017-2021 PARKS CIP PHASE 1 is located at MULTIPLE LOCATIONS, Copperas Cove, TX, 76522, in Bell County.

Who is the owner or developer of 2017-2021 PARKS CIP PHASE 1?

CITY OF COPPERAS COVE is the property owner/developer of record for 2017-2021 PARKS CIP PHASE 1, per its TDLR project registration.

Who is the architect or design firm for 2017-2021 PARKS CIP PHASE 1?

BSP ENGINEERS INC. is the design firm of record for 2017-2021 PARKS CIP PHASE 1, according to its TDLR filing.

How much does 2017-2021 PARKS CIP PHASE 1 cost and how big is it?

2017-2021 PARKS CIP PHASE 1 has an estimated construction value of $1.2M, based on its TDLR filing.

Scope of Work

This project consists of the construction of improvements to eight (8) parks throughout the city. (City, Rhode,

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

MULTIPLE LOCATIONS, Copperas Cove, TX, 76522

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 76522 (Copperas Cove)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Copperas Cove?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.