Project intelligenceTDLR EABPRJB8814408New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

NORTHAVEN TRAIL PH2A (HIKE & BIKE TRAIL)

TRAIL (PRESTON RD TO MIDWAY RD, Dallas, TX, 75230

Construction complete · Aug 2019Project Closed

NORTHAVEN TRAIL PH2A (HIKE & BIKE TRAIL) is a new construction project at TRAIL (PRESTON RD TO MIDWAY RD, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2019). The project has an estimated value of $3.0M.

Estimated project value
$3.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 1mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 10, 2018478 days across supplied datesAug 1, 2019

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    82 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    396 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75230 (Dallas)

One email per change. Unsubscribe in one click. Privacy.

NORTHAVEN TRAIL PH2A (HIKE & BIKE TRAIL) is a New Construction project located at TRAIL (PRESTON RD TO MIDWAY RD, Dallas, TX 75230 in Dallas, Texas. The project has an estimated value of $3.0M. PARKS & RECREATION DEPARTMENT is the property owner and URBAN ENGINEERS GROUP INC is the design firm of record. The project was registered with TDLR on April 10, 2018.

Frequently Asked Questions

What is NORTHAVEN TRAIL PH2A (HIKE & BIKE TRAIL)?

NORTHAVEN TRAIL PH2A (HIKE & BIKE TRAIL) is a new construction project at TRAIL (PRESTON RD TO MIDWAY RD in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: PROPOSED TRAIL FROM PRESTON RD TO MIDWAY RD. (APPROX. 2MILES) SCOPE INCLUDES: 12FT TRAIL, PEDESTRIAN BRIDGE, PAV

Is NORTHAVEN TRAIL PH2A (HIKE & BIKE TRAIL) open in Dallas?

Construction on NORTHAVEN TRAIL PH2A (HIKE & BIKE TRAIL) is complete — TDLR records show the project passed its required accessibility inspection in Aug 2019. The building is finished and very likely open.

Where is NORTHAVEN TRAIL PH2A (HIKE & BIKE TRAIL) located?

NORTHAVEN TRAIL PH2A (HIKE & BIKE TRAIL) is located at TRAIL (PRESTON RD TO MIDWAY RD, Dallas, TX, 75230, in Dallas County.

Who is the owner or developer of NORTHAVEN TRAIL PH2A (HIKE & BIKE TRAIL)?

PARKS & RECREATION DEPARTMENT is the property owner/developer of record for NORTHAVEN TRAIL PH2A (HIKE & BIKE TRAIL), per its TDLR project registration.

Who is the architect or design firm for NORTHAVEN TRAIL PH2A (HIKE & BIKE TRAIL)?

URBAN ENGINEERS GROUP INC is the design firm of record for NORTHAVEN TRAIL PH2A (HIKE & BIKE TRAIL), according to its TDLR filing.

How much does NORTHAVEN TRAIL PH2A (HIKE & BIKE TRAIL) cost and how big is it?

NORTHAVEN TRAIL PH2A (HIKE & BIKE TRAIL) has an estimated construction value of $3.0M, based on its TDLR filing.

Scope of Work

PROPOSED TRAIL FROM PRESTON RD TO MIDWAY RD. (APPROX. 2MILES) SCOPE INCLUDES: 12FT TRAIL, PEDESTRIAN BRIDGE, PAV

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

TRAIL (PRESTON RD TO MIDWAY RD, Dallas, TX, 75230

Location by street address

Watch all construction in 75230 (Dallas)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.